Secondary Water Inspection Information
Notice to Residents:
Prior to hooking your sprinkler system or connecting a hydrant to the secondary water system you NEED to have a Secondary Water Inspection.
The town has contracted Sam Adams to conduct these inspections, the town will cover the cost of the inspection UNTIL JUNE 1, 2026. After that date an inspection is still required, but the homeowner will be responsible for the cost of the inspection. The inspection Reports need to be filed with the town.
Contact Sam Adams to schedule your inspection, 435-513-5784.
Secondary Water Inspection Form
Public Works Engineering Standards Drawings
View PDF of Page