THE WIRE · UPDATED 2:48 AM MST No story is too small.
NewsWest Valley City

West Valley City invites bids for 5900 West Extension project

Utah.News 1 source cited 1 primary Primary: utah.gov Details

How this story was published

Published automatically from one public source cited; not yet reviewed by the desk. Tell us if something is wrong ↗

Primary source

utah.gov — an official government, school or university source.

Utah.News publishes every story with the sources it was built from. Questions or a correction: corrections@utah.news.

Official source · AI-written This story comes from an official government or institutional source.
A construction blueprint and an orange traffic cone resting on a vehicle, overlooking a long, straight road at sunset, symbolizing infrastructure development and urban expansion.
AI illustration
West Valley City is seeking bids for a construction project involving the 5900 West extension from Parkway Boulevard to Beagley Road. The project includes various infrastructure improvements such as pavement, storm drains, and lighting.

Key takeaways

  • West Valley City is seeking bids for the 5900 West Extension project from Parkway Boulevard to Beagley Road.
  • Work items include pavement, storm drains, sidewalk, and lighting.
  • Bids must be submitted electronically via Bonfire.com.
  • The bid deadline is scheduled for December 15, 2026, at 10:00 a.m.

West Valley City issued an invitation to bid on November 12, 2026, for the 5900 West Extension construction project. The project, identified as Project Number SP-497, involves connecting 5900 West from Parkway Boulevard to Beagley Road over approximately 0.25 miles.

The scope of work for the extension includes the installation of a cast-in-place box culvert, portland cement concrete pavement, hot mix asphalt, storm drains, curb, gutter, park strip, sidewalk, and lighting.

Plans for the project are distributed through https://utah.bonfirehub.com. Bids will be opened electronically via Bonfire.com, and no public bid opening will be held. Bid results will be made available on the Engineering Division website.

Bids are due on December 15, 2026, at 10:00 a.m. local prevailing time, as established by Bonfire.com.

Article details

CategoryNews
CityWest Valley City
ToneNeutral
ProductionAI Generated
Report a problem with this story
What's off? Pick any that fit, or just write below.

Every report is read and checked against the story's sources. Your email, if you give one, is used only to contact you about this message and is never shown publicly. Please keep other personal details out of the text. Privacy