The Highland City Council approved several key measures during its November 10, 2026, meeting, including a new storm water management ordinance and an agreement with The Ridges at Alpine, LLC. The council also introduced three new employees to city staff.
During the meeting, City Administrator Erin Wells introduced new hires including Javier Gonzalez as a Water Operator, Matthew Clarke as a Building Inspector, and Kolten Giles as a Parks Maintenance Lead. One full-time parks position remains open. Additionally, the council awarded a bid to M&M Asphalt Services for up to $57,754.98 for annual street crack sealing, following a low bid of just over $52,000. The contract requires that cracks be cleaned of seeds before sealing.
The council adopted a new Storm Water Management Plan presented by Staff Engineer Ryan Selee to meet State UPDES MS4 permit renewal requirements. The plan includes a biennial review of the State's impaired water bodies list, clarified public outreach, and revised construction site inspection requirements requiring at least four inspections for non-priority sites. The council also approved an amendment to the Ridgeview Planned Development, which allows street-side privacy fences on corner lots in the Townhome, Carriage, Cluster, and Cottage pods to be placed on the street-side property line instead of 14 feet from the back of the curb.
A substantive omnibus agreement was approved with The Ridges at Alpine, LLC, the developer of a 50-lot subdivision north of Beacon Hills in Draper. Under the agreement, Highland receives ownership of a water tank parcel appraised between $350,000 and $400,000, a clarified 20-foot waterline and access easement, a guaranteed connection to the Hog Hollow Trail, $25,000 for rerouting the southwest trail, and $75,000 for Dry Creek lift station improvements. The developer receives a dry utility easement, a driveway with pavers over the easement, the vacated southern portion of the tank site, and sewer connection rights through a 2005 agreement.
The council discussed a revised ranking of 53 potential sidewalk projects presented by Staff Engineer Ryan Selee. The projects, estimated at $27 million, were scored based on criteria including City-owned right-of-way, proximity to schools, and resident safety complaints. Council members requested that future rankings place more weight on streets without sidewalks on either side and include five years of pedestrian crash data.
The council continued a discussion regarding the sale of a 3,500 sq. ft. parcel in the Windsor Meadows neighborhood to gather more input on open space policy. Additionally, the council supported bringing a proposal to adjust special event fees back as an action item for future consideration.