THE WIRE · UPDATED 6:43 AM MST No story is too small.
NewsSt. George

Hillside Review Board recommends approval for Horizon Ridge development

Utah.News 1 source cited 1 primary Primary: sgcityutah.gov Details

How this story was published

Published automatically from one public source cited; not yet reviewed by the desk. Tell us if something is wrong ↗

Primary source

sgcityutah.gov — an official government, school or university source.

Utah.News publishes every story with the sources it was built from. Questions or a correction: corrections@utah.news.

Official source · AI-written This story comes from an official government or institutional source.
A close-up of architectural blueprints and a topographical map showing red rock terrain, symbolizing land development and urban planning.
AI illustration
The St. George Hillside Review Board met on Oct. 28, 2026, to discuss a development permit request for Horizon Ridge. The board voted unanimously to recommend approval for the project, noting that certain steep slopes are non-contiguous anomalies.

Key takeaways

  • The Hillside Review Board unanimously recommended approval for the Horizon Ridge development permit.
  • The project involves single-family home construction in areas with slopes between 20% and 40% or higher.
  • The board determined that certain identified steep slopes are non-contiguous anomalies.
  • The meeting took place on Oct. 28, 2026, at 8:30 A.M. on site.

The St. George Hillside Review Board voted unanimously on Oct. 28, 2026, to recommend approval for the Horizon Ridge development permit. The request involves disturbing areas with slopes ranging from 20% to over 40% to allow for the construction of single-family homes.

The Horizon Ridge application, identified as case number 2026-HS-008, was presented to the board. The project, located at 1150 West north of Curly Hollow Dr., is being developed by American Consulting and Engineering with representative Austin Chappell. A presentation regarding the development was provided by Jeff Thomas.

During the meeting, Board Member Dave Black made a motion to recommend approval of the development. The motion specified that the localized steep slopes indicated on the slope map are non-contiguous anomalies and recommended they not be considered in the overall project design. The motion was seconded by Board Member Jeff Mathis and received unanimous support from Board Members Black, Mathis, Kevin Holyoak, and Chair James Sullivan.

The meeting was attended by several city staff members, including Engineering Manager Carolyn Prickett, Community Development Director Carol Winner, City Landscape Architect Mark Goble, Planner Lonnie Olson, and Assistant City Attorney Daniel Baldwin. Development Office Supervisor Angie Jessop was also present. Board Member Hugo Angeles was excused from the session.

Following the discussion on Horizon Ridge, the board considered and approved the minutes from the Aug. 26, 2026, meeting via a motion by Dave Black and a second by Kevin Holyoak.

Watch

Utah News

Article details

CategoryNews
CitySt. George
ToneNeutral
ProductionAI Generated
Report a problem with this story
What's off? Pick any that fit, or just write below.

Every report is read and checked against the story's sources. Your email, if you give one, is used only to contact you about this message and is never shown publicly. Please keep other personal details out of the text. Privacy