THE WIRE · UPDATED 1:08 PM MST No story is too small.
NewsHurricane

Hurricane planners approve Kachina Ridge plat and send sensitive-lands plan to council

Utah.News 1 source cited Details

How this story was published

Published automatically from one public source cited; not yet reviewed by the desk. Tell us if something is wrong ↗

Source

utahledger.com

Utah.News publishes every story with the sources it was built from. Questions or a correction: corrections@utah.news.

AI-written from public sources Written by Utah News AI and quality-checked before publishing.
Hurricane planners approve Kachina Ridge plat and send sensitive-lands plan to council
Photo via utahledger.com
Hurricane Planning Commission members voted 5-0 on Oct. 22 to approve the preliminary plat for the Kachina Ridge development and recommended approval for its sensitive lands development plan. The City Council is scheduled to hold a public hearing regarding the sensitive lands application on Nov. 5.

Key takeaways

  • The Planning Commission voted 5-0 on Oct. 22 to approve the Kachina Ridge preliminary plat and recommend the sensitive lands plan.
  • The development at 720 E. Highway 59 is expected to consist of 57 lots, including townhomes and commercial uses.
  • Approval is contingent upon several conditions, including a traffic impact study and the construction of a cliff-side barrier.
  • A public hearing for the sensitive lands application is scheduled for Nov. 5 at 6 p.m.

The Hurricane Planning Commission approved the preliminary plat for the Kachina Ridge mixed-use development and recommended approval of its sensitive lands development plan during a meeting on Oct. 22. Both measures passed with 5-0 votes, according to meeting video, though official minutes are pending.

Located at 720 E. Highway 59, the Kachina Ridge project is described in the agenda as a 56-lot development. However, a staff report counts 57 lots, including 48 townhomes and nine lots intended for commercial uses, multifamily units, and short-term rentals. Kent Stephens is the applicant for the project, with Brandee Walker serving as the agent.

A 2020 development agreement, recorded in 2021, limits the site to 566 residential units and requires the construction of a UDOT-approved interchange on Highway 59. Commissioners were informed that no development can begin until an approved UDOT plan for the interchange is in place. City engineering staff are expected to meet with UDOT in December.

The plat approval remains subject to various conditions, including comments from staff and the Joint Utility Committee. These requirements include a second fire access, a water model to ensure the neighboring system is unaffected, and a traffic impact study for several intersections: State Street and Main Street, Main Street and 100 South, and 100 South and 100 East. Additionally, construction plans for a water tank and the interchange must be approved before or alongside the subdivision's construction plans.

During the meeting, Commissioner Ralph Ballard raised concerns regarding the cliff edge and requested a durable barrier. He suggested that the sewer outfall should be bored to avoid sensitive lands concerns rather than cutting into the cliff, an option he described as poor. Commissioner Paul Farthing moved to approve the plat with the condition that a city-acceptable barrier be constructed along the cliff side.

The Hurricane City Council will hold a public hearing on the sensitive lands application during its 6 p.m. meeting on Nov. 5.

Article details

CategoryNews
CityHurricane
ToneNeutral
ProductionAI Generated
Report a problem with this story
What's off? Pick any that fit, or just write below.

Every report is read and checked against the story's sources. Your email, if you give one, is used only to contact you about this message and is never shown publicly. Please keep other personal details out of the text. Privacy