THE WIRE · UPDATED 6:44 AM MST No story is too small.
Official SourceBluff

Town of Bluff - Expedited RFQ for EWP Engineering and Construction Management Services

Utah.News 1 source cited 1 primary Primary: townofbluffutah.gov Details

How this story was published

Published automatically from one public source cited; not yet reviewed by the desk. Tell us if something is wrong ↗

Primary source

townofbluffutah.gov — an official government, school or university source.

Utah.News publishes every story with the sources it was built from. Questions or a correction: corrections@utah.news.

Official source This story comes from an official government or institutional source.
A close-up of a manila folder and a drafting compass resting on a wooden desk next to a topographical map, symbolizing official engineering and planning processes.
AI illustration
TOWN OF BLUFF | SAN JUAN COUNTY, UTAH Town of Bluff • Expedited EWP Engineering RFQ | 1 REQUEST FOR QUALIFICATIONS (RFQ) - Expedited Professional Engineering and Construction Management Services NRCS Emergency Watershed Protection (EWP)…

TOWN OF BLUFF | SAN JUAN COUNTY, UTAH

Town of Bluff • Expedited EWP Engineering RFQ | 1

REQUEST FOR QUALIFICATIONS (RFQ) - Expedited

Professional Engineering and Construction Management Services

NRCS Emergency Watershed Protection (EWP) and Flood Mitigation

Issued by: Town of Bluff, Utah

RFQ Contact: Josh Ewing, Mayor

mayorewing@townofbluffutah.gov

801.870.5195

RFP Issued:

SOQ Due:

Tuesday, November 24

Thursday, December 3rd, 5:00 PM Mountain Time

1. Purpose and Project Background

The Town of Bluff ("Town") invites Statements of Qualifications (SOQs) from qualified

engineering firms to provide assessment, planning, design, and construction management

services for potential flood mitigation and watershed protection projects. The Town anticipates

pursuing assistance through the USDA Natural Resources Conservation Service (NRCS)

Emergency Watershed Protection (EWP) Program and, as appropriate, other disaster recovery

funding sources.

Flooding in October and November 2026 affected Bluff and surrounding areas. Potential

projects may address flood and erosion hazards associated with the San Juan River,

Cottonwood Wash, and related drainage areas, including threats to homes, public facilities,

roads, and other infrastructure. Specific projects, eligibility, and funding remain to be

determined.

This is a competitive, qualifications-based solicitation with an accelerated response schedule

because of flood risks and federal program timelines. Firms should be able to mobilize

promptly after written authorization. This RFQ does not guarantee a contract or funding.

2. Anticipated Scope of Engineering and Construction Management

Depending on site conditions, funding, and Town direction, services may include:

• Site reconnaissance, damage documentation, hazard assessment, project prioritization,

and support for NRCS site visits and damage survey reports.

• Hydrologic and hydraulic analysis, floodplain and channel assessments, erosion and

sediment evaluations, and alternatives analysis.

• Conceptual and final engineering design of flood mitigation, channel stabilization, drainage,

bank protection, and sediment or debris management measures.

• Surveying coordination, technical studies, construction plans and specifications, engineer’s

estimates, bid documents, and design certifications.

• NRCS EWP coordination and technical documentation; eligibility, cost-effectiveness and

environmental review support; permitting and landowner/agency coordination.

• Bidding assistance, construction management and administration, site observation or

inspection, contractor coordination, submittal review, pay applications, change orders,

quality assurance, and project closeout.

TOWN OF BLUFF | SAN JUAN COUNTY, UTAH

Town of Bluff • Expedited EWP Engineering RFQ | 2

Assignments may be phased or authorized by task order. Any construction contracts will be

separately procured. Individual EWP activities and funding eligibility remain subject to NRCS

review, applicable environmental requirements, and the sponsor agreement.

3. Minimum Qualifications

• A Utah-licensed Professional Engineer responsible for the engineering work, with

appropriate qualified support staff and subconsultants.

• Relevant experience in flood mitigation, hydrology/hydraulics, stream or channel

stabilization, and engineering-led construction management; NRCS EWP or similar

federally supported projects are strongly preferred.

• Demonstrated ability to meet accelerated project schedules, coordinate with public

agencies, and provide field presence in Bluff as needed.

• Ability to meet applicable professional liability, general liability, workers’ compensation, and

other contract insurance requirements.

4. Statement of Qualifications

To reduce preparation time, firms may submit existing qualification materials with brief project-

specific supplements. Send one searchable PDF, preferably no more than ten pages excluding

resumes and project sheets, addressing:

• Letter of interest, firm contact information, and confirmation of Utah professional licensure

and insurance eligibility.

• Two or three relevant project examples, highlighting NRCS EWP, federally funded

emergency watershed work, or comparable flood mitigation projects.

• Proposed project manager, responsible professional engineer, construction management

lead, key personnel, and subconsultants, including their specific roles.

• Current workload, earliest mobilization date, ability to respond on-site, and staff availability

through design and construction.

• A brief initial approach to flood mitigation, coordination with NRCS and the Town, and

delivery of design and construction management services.

• At least two client references for similar work, with names, emails, and telephone numbers.

Do not submit fees, hourly rates, or other price information. Scope and compensation will be

negotiated following qualifications ranking.

5. Evaluation and Selection

The Town will evaluate responsive SOQs using the following published criteria:

Evaluation factor Points

NRCS EWP, emergency watershed, and flood mitigation experience 30

Qualifications of assigned personnel; engineering and construction management

expertise 25

Staff capacity, mobilization and ability to maintain field support 20

Understanding of Bluff’s needs and proposed technical approach 15

Past performance and references 10

Total: 100

TOWN OF BLUFF | SAN JUAN COUNTY, UTAH

Town of Bluff • Expedited EWP Engineering RFQ | 3

The Town may check references, request clarifications, or conduct short interviews.

Responsive firms will be evaluated and ranked on the published criteria. The Town intends to

negotiate a fair and reasonable scope and fee with the highest-ranked qualified firm; if

negotiations are unsuccessful, the Town may proceed to the next-ranked qualified firm.

Selection and contracting are subject to the Town’s procurement procedures, applicable law,

required approvals, and funding conditions.

6. Submission Instructions

SOQs due: Thursday, December 3rd, 5:00 PM Mountain Time. Submit one PDF to

mayorewing@townofbluffutah.gov with subject “SOQ – BLUFF EWP FLOOD ENGINEERING –

[FIRM NAME].” Questions must be emailed to the RFQ contact. The Town may publish written

clarifications or addenda and adjust the schedule consistent with its procurement procedures.

7. Contract Term, Funding and General Conditions

The Town anticipates a professional services agreement covering authorized planning, design,

construction management, and closeout work, potentially over multiple phases and beyond 60

days. The term and task authorizations will be established in the negotiated contract based on

project needs, funding, and Town approval. No work may begin without a written contract and

authorization from the Town.

The Town may reject any or all SOQs, waive minor nonmaterial irregularities, request

information, cancel or reissue the RFQ, or decline to award. Submittals and contracts may be

subject to Utah’s Government Records Access and Management Act (GRAMA); firms bear

submission costs. NRCS reimbursement is not guaranteed, and activities undertaken before an

executed NRCS–sponsor agreement should not be presumed eligible for NRCS funding.

- END OF DOCUMENT -

Article details

CategoryOfficial Source
CityBluff
ToneNeutral
Report a problem with this story
What's off? Pick any that fit, or just write below.

Every report is read and checked against the story's sources. Your email, if you give one, is used only to contact you about this message and is never shown publicly. Please keep other personal details out of the text. Privacy