THE WIRE · UPDATED 4:17 PM MDT No story is too small.
Multi-SourcePark City

Pleasant Grove Outlines Building Permit Requirements and Procedures

Official source This story comes from an official government or institutional source. How it was made ↓
A close-up of architectural blueprints and drafting tools on a wooden table with a view of Mount Timpanogos in the background, symbolizing construction planning and building permits in Pleasant Grove, Utah.
Photo via AI illustration
The City of Pleasant Grove maintains strict permitting requirements for new residential and commercial construction to ensure compliance with international building codes. The city's Building Division processes all applications electronically through an online portal.

Key takeaways

  • Pleasant Grove requires permits for various projects including pools, sheds over 200 square feet, and retaining walls taller than four feet.
  • The Building Division enforces multiple international codes, such as the International Plumbing Code and National Electrical Code.
  • All building permit applications must be submitted electronically via the city's online portal.
  • Initial plan reviews for single-family residential developments are completed within 14 business days per Utah state law.

The City of Pleasant Grove requires building permits for all new construction and various structural modifications, including additions, basement finishes, and fences exceeding six feet in height.

Building Code and Standards

According to the Pleasant Grove Building Division, the department is responsible for reviewing building plans to ensure they meet the International Building Codes. The division enforces several standards mandated by Utah Code Title 15A, including the 2021 International Residential Code and the 2021 International Building Code.

Electronic Application Process

All building permit applications are processed electronically. To apply, residents and developers must submit documentation through the city's online portal. For new residential or commercial construction, applicants are required to provide electronic copies of plans and engineering, a site plan to scale, and structural engineering plan reviews.

Project Submittal Fee Breakdown

The city's submittal fees vary based on the project type. A new single-family residential permit carries a $250 submittal fee, while new commercial shells cost $500. Smaller projects, such as solar installations, basements, or additions, require a $75 fee.

Review Timelines and Fees

Under Utah Code Section 10-6-160, initial plan reviews for single-family residential developments are to be completed within 14 business days. The submittal fee paid during the application process is applied toward the total cost of the building permit.

Sources used (2)

How this story was made

Corroborated by 2 independent sources

Utah News confirmed this story across multiple independent newsrooms before publishing.

parkrecord.compgcityutah.gov

2 sources gathered

Coverage collected from the outlets listed above. · August 19, 2026

Written by AI

Utah News AI (on-device model) · drawing on 2 outlets · June 13, 2026

Quality checks

Passed editorial quality review (90/100)

Published

72 days ago · June 13, 2026

This story was written by AI from the public sources listed above and passed automated quality review before publishing.

Article details

CategoryMulti-Source
CityPark City
ToneNeutral
SourceAI Generated