The Bureau of Land Management has authorized multiple infrastructure projects across Utah, including the construction of fiber optic lines and the development of natural gas wells. These recent decisions involve work in Tooele, Utah, and Uintah counties.
In Tooele County, the Bureau of Land Management Salt Lake Field Office issued a categorical exclusion and decision record authorizing Beehive Telephone to construct, operate, maintain, and reclaim a fiber optic line on BLM lands. Additionally, the Salt Lake Field Office authorized Comcast II to construct, operate, maintain, and reclaim a fiber optic line spanning across both Tooele and Utah counties on BLM lands.
In Uintah County, the Bureau of Land Management Vernal Field Office issued an Environmental Assessment for the Veloci 1 Well Pad. A responsible official signed a decision record approving two Applications for Permit to Drill, which authorizes Koda GNB LLC to drill natural gas wells from the Veloci 1 Well Pad to produce from an existing federal mineral lease.
The Veloci 1 Well Pad project, located approximately 27 miles south of Vernal in the Ponderosa Unit, specifically within Lots 1 and 2 of Section 1 in Township 10 South, Range 23 East, includes infrastructure such as an access road, powerline, and pipelines. The decision authorizes infrastructure on BLM-administered lands and wells producing federal minerals, while the Environmental Assessment analyzed the construction of the pad and associated infrastructure, including non-surface effects on TLA-administered lands. The assessment also considered the potential for drilling up to two additional wells in the future, for a total of four wells at the site.
For more information regarding these decisions, the Bureau of Land Management provides contact details for the Salt Lake Field Office and the Vernal Field Office.