THE WIRE · UPDATED 3:41 PM MST No story is too small.
NewsSalt Lake City

Torus launches Torus Foundry and secures $500M for AI compute

Utah.News 1 source cited Details

How this story was published

Published automatically from one public source cited; not yet reviewed by the desk. Tell us if something is wrong ↗

Source

torus.co

Utah.News publishes every story with the sources it was built from. Questions or a correction: corrections@utah.news.

AI-written from public sources Written by Utah News AI and quality-checked before publishing.
Torus launches Torus Foundry and secures $500M for AI compute
Photo via torus.co
Torus announced the launch of Torus Foundry on November 9, a modular AI inference compute system designed to operate using existing power at various sites. The company has raised $500 million in funding, led by Magnetar, to expand the technology nationwide.

Key takeaways

  • Torus launched Torus Foundry on November 9 to bring AI compute to existing power sources.
  • The company secured $500 million in funding led by Magnetar.
  • Foundry units are prefabricated at GigaOne in Salt Lake City.
  • The company targets 47,000 GPUs by the end of 2027.

Torus launched Torus Foundry on November 9 to provide modular AI inference compute that utilizes power already available at existing sites. The company announced it has raised $500 million in funding, led by Magnetar, to take the technology nationwide.

The Foundry units are prefabricated modules containing power, storage, cooling, networking, and compute. These units are built at GigaOne in Salt Lake City. According to Torus, site preparation takes approximately one week and installation takes one to two days, allowing a transition from contract to token in 12 to 16 weeks.

Each Foundry unit pairs with Reserve, a proprietary energy storage and management system. This system is designed to smooth out the spiked electricity loads typical of AI inference, providing a steady load to the grid. Torus installs these systems at commercial and industrial sites to function as distributed energy resources or virtual power plants.

The company's initial customers include Hydra Host and another AI Cloud provider, which currently run thousands of GPUs. Torus aims to reach 47,000 GPUs by the end of 2027. Funding for the venture was provided by Magnetar, ICONIQ, Origin Ventures, Ridgeline Partners, and Trinity Capital.

Torus previously announced the renaming of its flagship products, including Torus Reserve, Torus Protect, and Torus Arc, on November 9.

Article details

CategoryNews
CitySalt Lake City
ToneNeutral
ProductionAI Generated
Report a problem with this story
What's off? Pick any that fit, or just write below.

Every report is read and checked against the story's sources. Your email, if you give one, is used only to contact you about this message and is never shown publicly. Please keep other personal details out of the text. Privacy