In a notice posted to the city's website, Springdale announced an open bid for the Quail Ridge Sidewalk Extension project. The public works project aims to improve local pedestrian infrastructure east of SR-9.
The proposed project includes constructing approximately 600 linear feet of new sidewalk from near the LDS chapel down to Quail Ridge Road to tie into the trail on the west side of SR-9. Additional work involves constructing driveways, parking areas, and a retaining wall measuring 175 feet long with a maximum height of 6 feet. The project also includes the construction of ADA ramps and the reconstruction of existing storm drain structures.
Plans and bid documents are available through the Sunrise Engineering Plan Room. The bid is scheduled to close on Nov. 3, 2026, at 1:30 PM.
Blaine Worrell of Sunrise Engineering is listed as the contact person for this solicitation.