THE WIRE · UPDATED 4:13 PM MDT No story is too small.
Official SourceSalt Lake City

SLC completes new bikeways, longest continuous public art in Utah to date

Official source This story comes from an official government or institutional source.
A close-up view of a new white bicycle lane stripe meeting a colorful geometric pavement pattern on a sunlit Salt Lake City street, symbolizing new urban infrastructure and public art integration.
Photo via AI illustration
May 27, 2026 Salt Lake City officials cut the ribbon on the 400 South Viaduct Trail bridge Wednesday, marking the completion of a new protected bike route that links downtown and the Granary District to the extended 300 West path. The 400 South Viaduct Trail is one of only two

Key takeaways

  • The new trail provides a safer, direct route for pedestrians and cyclists to reach downtown without waiting for trains.
  • The project features concrete barriers and artist-designed elements inspired by the local landscape.
  • The Strut artwork is the longest continuous public art installation in the state of Utah.
  • The completion celebrates shared city goals of improving connectivity and fostering neighborhood pride through infrastructure and art.

May 27, 2026

Salt Lake City officials cut the ribbon on the 400 South Viaduct Trail bridge Wednesday, marking the completion of a new protected bike route that links downtown and the Granary District to the extended 300 West path.

The 400 South Viaduct Trail is one of only two routes where residents can cross the city on foot or by bike without the possibility of waiting for a train to pass.

“For westside residents, this trail means a safer, more direct way to reach downtown, school, work, parks, and more without needing a car,” said Mayor Erin Mendenhall. “The 400 South viaduct used to be an unsafe and unwelcoming place to walk or bike. Now, with a protected trail, concrete barrier, and public art, it’s a real connection between neighborhoods.”

The trail features “Strut,” a public artwork composed of artist-designed fence and concrete barrier elements inspired by the colors of the surrounding landscape and neighborhood. Created by the Seattle-based artist team of Laura Haddad and Tom Drugan, “Strut” extends nearly 2,000 feet along the corridor, making it the longest continuous public artwork in Utah to date.

“Art can transform how people experience infrastructure,” said Tammy Hunsaker, Director of the Department of Community and Neighborhoods. “It can create moments of wonder, belonging, and civic pride in the places we move through every day.”

The bikeways and “Strut” reflect shared goals among the City and its partners: streets that connect people no matter how they choose to travel and art that builds on neighborhood pride.

The City is hosting a celebration bike ride marking the completion of two new bikeways and a public art installation on Wednesday at 5:30 p.m. The ride will take place on Wednesday evening in partnership with Poplar Grove Community Council and Neighborhood House.

Article details

CategoryOfficial Source
CitySalt Lake City
ToneNeutral