THE WIRE · UPDATED 9:11 AM MDT No story is too small.
Official SourceAlpine

Lehi High’s last Alpine year: the 60% yes vote, a Lehi-rooted superintendent, and maps still being drawn

Official source This story comes from an official government or institutional source. How it was made ↓
Lehi High’s last Alpine year: the 60% yes vote, a Lehi-rooted superintendent, and maps still being drawn
Photo via ksl.com
Lehi High is spending 2026-27 as Alpine School District’s last year, but the real change is already in motion: Lehi voted 60.4% to leave, the school will land in Aspen Peaks under former Pioneer teacher Joel Perkins, and buildings, money, and some attendance lines are still being sorted before July 1, 2027.

Lehi High School opened Alpine School District’s last school year on August 19, but the decision that will actually change the Pioneer campus was made two years earlier — and the handoff is already underway in board rooms, not just in first-day hallways. When Alpine dissolves on June 30, 2027, Lehi High will belong to Aspen Peaks School District, the largest of three successors, with about 35,000 students, 36 schools, four high schools, and a superintendent who began his career teaching social studies and coaching in that same building.

Why Lehi left Alpine

Utah County voters in November 2024 approved two ballot measures that break up Utah’s largest district. Proposition 11 created the north-central district now named Aspen Peaks — Alpine, American Fork, Cedar Hills, Highland, Lehi, and the Utah County portion of Draper. Proposition 14 created Lake Mountain from Eagle Mountain, Saratoga Springs, Cedar Fort, and Fairfield. Orem, Lindon, Pleasant Grove, and Vineyard became Timpanogos by leftover.

Lehi was the engine of the yes vote. City precincts backed Proposition 11 by 21,312 to 13,974, or 60.4%. Highland voted 61.2% yes. American Fork was the only city to vote no, 9,277 to 8,236. The Utah County Commission adopted the city-line maps in March 2025. Voters then filled 21 new board seats on November 4, 2025; the boards were sworn in on November 25.

Two arguments drove the split: a seven-member Alpine board governing more than 80,000 students across 10-plus high schools, and west-side growth that outran new buildings. Alpine still employs the teachers, sets the calendar, and runs the buses through this school year. Aspen Peaks does not operate a classroom until July 1, 2027.

Photo via provo.com

Enrollment, Dry Creek, and the next map

Lehi High has been growing even as Alpine as a whole prepares to shrink. The school enrolled 2,242 students in grades 10-12 in the most recent public count, a 30% increase over five school years. Alpine’s March 31, 2026, Skyward snapshot put Lehi High at 2,311 students, including self-contained programs — 806 sophomores, 772 juniors, and 714 seniors. Nearby Skyridge High, also in Lehi and also bound for Aspen Peaks, stood at 2,494. Westlake High, which will go to Lake Mountain, was at 3,121.

That west-side crush is why Alpine’s board unanimously approved a $234 million lease revenue bond on April 22, 2025, for a new Saratoga Springs high school targeted to open in fall 2028 and an Eagle Mountain elementary targeted for 2027. After July 1, 2027, Lake Mountain assumes the remaining debt. Then-Superintendent Shane Farnsworth said a high school takes about three years to build, so work had to start while Alpine still existed.

The split itself does not automatically reassign Lehi High students. Buildings follow geography. What can move a child is a later boundary study. Alpine’s own transition page flags Dry Creek Elementary, which sits in Lehi (Aspen Peaks) but draws from Saratoga Springs (Lake Mountain). On March 10, 2026, the Alpine board approved Boundary Option 3 for Lehi and Saratoga Springs elementary schools, effective for 2026-27. Alpine Superintendent Rob Smith told residents at a Cedar Hills Country Club briefing reported August 21 that overlapping city and future-district lines make those maps “particularly complicated,” and that the new boards — not Alpine — will decide how to handle enrollment, possible closures, and student-teacher ratios.

Lehi High has not published a course-by-course analysis of how the split would change AP offerings, athletics, or clubs. Asked about special education and extracurriculars, Smith said each new district has already begun discussing whether programs stay the same or diverge, and that growth, enrollment, and money will drive those choices. Student activity funds and Alpine Foundation accounts already tied to a school stay with the district where that school sits, which means Lehi High’s assigned accounts follow the Pioneers into Aspen Peaks.

A Lehi-rooted superintendent, and the money still being counted

Aspen Peaks’ board unanimously appointed Joel Perkins, Ph.D., as its first superintendent on January 26, 2026, in American Fork. Perkins started in Alpine in 1999 at Lehi High, later served as principal of Lehi Junior High, and opened Skyridge High in 2016 as its founding principal. “This is my community. I have lived and worked here for the last 27 years,” he said after the vote. Board President Diane Knight, a retired Alpine teacher who ran in her hometown of Lehi, called him the “perfect person” to lead the new district.

On June 26, 2026, the three successor boards signed an asset-and-liability agreement Alpine called historic. Unassigned funds will be split by June 30, 2027, enrollment. On current counts, Aspen Peaks would take 41.78%, Lake Mountain 30.16%, and Timpanogos 28.06%. Employee vacation hours carry over, and post-retirement benefits stay even if a worker later switches among the three. “This was not about winners and losers. This was about creating three strong districts,” Knight said.

Aspen Peaks approved its first original operating budget for fiscal 2027 on June 11, projecting about $3.77 million in operations revenue while it is still a startup. Business Administrator Bea Twede said the district has about $10 million from Alpine in a capital building fund and is hunting for a permanent office because Alpine’s American Fork campus will sit in Timpanogos territory. On August 14, 2026, Aspen Peaks approved a deal letting Timpanogos lease bus-yard space; Timpanogos expects about 80 buses, 90 stalls, and shared maintenance staff under a three-year lease.

Smith, who came out of retirement to run Alpine through the wind-down, told the Cedar Hills audience that employment offers required by January 2027 were on track to go out in late August 2026, months early. He said Alpine hit a 93% graduation rate last year and that student achievement remains “our moral compass.” On what the new districts will look like after year one, he said: “Let the dust settle, get year one under, and then what happens next.”

Tax rates for Aspen Peaks have not been set. Each new board will run its own Truth in Taxation process. Boundary studies — not the split letterhead — are the item most likely to move a Lehi High family.

How this story was made

Corroborated by 9 independent sources

Utah News confirmed this story across multiple independent newsrooms before publishing.

18 sources gathered

Coverage collected from the outlets listed above. · August 19, 2026

Published

11 hours ago · August 23, 2026

Article details

CategoryOfficial Source
CityAlpine
ToneNeutral