Bid Advertisement – 2026 SSMH Liner Project

Official source This story comes from an official government or institutional source.
A close-up view of technical blueprints and drafting tools on a wooden desk, symbolizing a large-scale industrial construction bid process in Orem, Utah.
Photo via AI illustration

Key takeaways

  • Bid deadline: June 9, 2026, at 2:00 p.m.
  • Submission method: Sealed bids or electronic submittal via Bonfire (preferred).
  • Mandatory pre-bid meeting: May 28, 2026, at 2:00 p.m. at the City Center in Orem.
  • Contract documents availability: Available starting May 18, 2026, via Bonfire or at the City of Orem Engineering Division.
  • Document fees: No fee for digital downloads on Bonfire; a $20.00 non-refundable fee applies for physical copies (plus a $5.00 mailing charge).
  • Project Manager: Tiffany Farnsworth (801-229-7318).

RECEIPT OF BIDS: Separate sealed BIDS or Electronic Submittal using Bonfire for the construction of 2026 SSMH Liner Project will be received by Taggart Bowen, City Engineer at the City of Orem, Engineering Division, 56 North State, Orem, UT 84057, or opened electronically on Bonfire until June 9, 2026 at 2:00 p.m. and then at said office publicly opened and read aloud. The preferred method for submitting a bid is by using Bonfire at https://utah.bonfirehub.com (Select the search bar > > enter “City of Orem” > Enter).

BIDDING QUESTIONS – Use Bonfire to submit questions and download documents relating to bid items, specifications, and other technical questions. The Project Manager is Tiffany Farnsworth, 801-229-7318. A mandatory pre-bid meeting will be held on May 28, 2026 at 2:00pm at the City Center, 56 North State Street, Orem, UT 84057 in the Community Development Ponderosa Conference Room.

OBTAINING CONTRACT DOCUMENTS: The CONTRACT DOCUMENTS may be obtained May 18, 2026, on Bonfire or at the City of Orem, Engineering Division, Community Development Offices, 56 North State Street, Orem, UT 84057. There is no fee from the city to obtain the documents on Bonfire. There will be a $20.00 non-refundable fee for a copy of the plans and specifications. (An additional $5.00 service charge will be assessed if the plans and specifications are to be mailed).

DESCRIPTION OF WORK: The WORK includes but is not limited to the following: Installation of 416 vertical feet of sprayed applied protective lining in 40 sanitary sewer structures. The engineer’s estimate for the work is $150,000.00 – $200,000.00.

SITE OF WORK: The site of the WORK is located throughout Orem, Utah but is generally located from 1200 N. and 1600 W. to 2000 S. and Main Street.