THE WIRE · UPDATED 9:46 AM MDT No story is too small.
NewsMurraySalt Lake City

Murray PC Approves Intermountain Health Cancer Center Tower Plans

Utah.News 1 source cited Details

How this story was published

Published automatically from one public source cited; not yet reviewed by the desk. Tell us if something is wrong ↗

Source

buildingsaltlake.com

Utah.News publishes every story with the sources it was built from. Questions or a correction: corrections@utah.news.

AI-written from public sources Written by Utah News AI and quality-checked before publishing.
A low-angle view of a modern glass and concrete architectural structure under a bright sky, symbolizing growth and urban development.
Photo via AI illustration
The Murray City Planning Commission unanimously approved an amendment to an existing conditional use permit, allowing Intermountain Medical Center to expand with a new cancer center tower. The project includes a multi-level parking structure and a pedestrian bridge to connect the new facilities.

Key takeaways

  • The Murray City Planning Commission unanimously approved an expanded conditional use permit for Intermountain Medical Center.
  • The new cancer center tower will be nine stories tall and encompass over 539,000 square feet.
  • A new four-level parking structure with 665 stalls will be constructed along State Street.
  • Construction on the parking structure could begin in early 2027, with other project elements slated for spring 2027.

The Murray City Planning Commission has unanimously approved plans for a new cancer center tower at Intermountain Medical Center. The expansion will include a nine-story building totaling just over 539,000 square feet of new space.

The proposed tower will be built on a surface parking lot located to the northeast of the main hospital tower on the 63-acre medical center site. While the building's height is approximately 149 feet from the finished grade to the highest point of the roof, it remains well within the limits allowed by the Commercial (C-D) zoning. Because medical services are a conditional use under this zoning, the commission's vote on the updated conditional use permit was required to move the project forward.

Additional infrastructure will support the new facility, including a new four-level, 665-stall parking structure to be built along State Street. This addition will bring the total number of parking stalls at the complex to approximately 4,900. Plans also include a pedestrian bridge to connect the cancer center with the new parking structure and an expansion of the complex's central utility plan.

Jeff Pinegar, a principal at VCBO Architecture, stated that construction for the parking structure could begin near the beginning of 2027. Other aspects of the project are expected to begin construction in the spring of 2027. During the planning process, the commission added a condition to encourage the preservation of existing trees on the property, a move Pinegar said Intermountain Health would support.

The approval follows a previous conditional use permit granted in 2004 that allowed for the initial construction of the hospital complex. This expansion is part of broader developments in the area, as the Murray City Council is considering a plan for development around the Murray Central Station, and Intermountain Health is also planning a hospital project in Downtown Salt Lake City.

Article details

CategoryNews
CityMurray, Salt Lake City
ToneNeutral
ProductionAI Generated