THE WIRE · UPDATED 12:10 AM MDT No story is too small.
NewsLaytonSalt Lake City

Layton Construction to Build Medic Training Campus at Joint Base San Antonio

Utah.News 1 source cited 1 primary Primary: laytonconstruction.com Details

How this story was published

Published automatically from one public source cited; not yet reviewed by the desk. Tell us if something is wrong ↗

Primary source

laytonconstruction.com — the source this story was built from.

Utah.News publishes every story with the sources it was built from. Questions or a correction: corrections@utah.news.

AI-written from public sources Written by Utah News AI and quality-checked before publishing.
Layton Construction to Build Medic Training Campus at Joint Base San Antonio
Photo via Layton Construction Company, LLC
Layton Construction has been selected by the Department of the Air Force to deliver the Medical Education and Training Campus Recapitalization program at Joint Base San Antonio-Fort Sam Houston. The project involves building five new dormitory facilities to house approximately 6,000 joint-force combat medic students.

Key takeaways

  • Layton Construction will build five new 400,000 SF dormitories at Joint Base San Antonio-Fort Sam Houston.
  • The project aims to house 6,000 joint-force combat medic students from the Army, Navy, and Air Force.
  • The progressive design-build method has accelerated the project timeline by 70% and reduced costs by 20%.
  • The program is scheduled for completion before the end of 2028.

The Department of the Air Force has selected Layton Construction to deliver the Medical Education and Training Campus (METC) Recapitalization program at Joint Base San Antonio-Fort Sam Houston, according to a report published October 19. Working in partnership with Gensler and Volumetric Building Companies (VBC), Layton will develop five new dormitory facilities under a single contract.

The 2 million square foot progressive design-build (PDB) program is operating on a rapid schedule. The project aims for completion before the end of 2028, following six to eight months of collaborative design. Each of the five 400,000 square foot dormitories is intended to house approximately 6,000 joint-force combat medic students from the Army, Navy, and Air Force attending the METC.

Layton Construction Design Manager Clint Watson stated that the team is working around the clock to complete the gigantic buildings in a year, noting the process is both exciting and incredibly challenging. The project will utilize extensive modular and prefabricated construction strategies alongside lean and highly integrated design processes.

The use of the progressive design-build delivery method on this project has accelerated the timeline by 70% and reduced costs by 20%. Layton Construction Executive Vice President Eric Nay said the award is the culmination of several years of hard work, relationship building, and proven performance throughout the government's procurement process.

Headquartered in Salt Lake City, Utah, Layton Construction is a privately held national general contractor that has been delivering commercial construction since 1953. The company operates from 16 strategic offices across the United States and employs more than 2,200 construction professionals across various markets, including healthcare, education, and industrial.

Article details

CategoryNews
CityLayton, Salt Lake City
ToneNeutral
ProductionAI Generated
Report a problem with this story
What's off? Pick any that fit, or just write below.

Every report is read and checked against the story's sources. Your email, if you give one, is used only to contact you about this message and is never shown publicly. Please keep other personal details out of the text. Privacy