Contact:
Michael Luers
(435) 901-8891
mluers@sbwrd-ut.gov
FOR IMMEDIATE RELEASE
UNKNOWN POLLUTANT IMPACTS
WASTEWATER TREATMENT FACILITY
PARK CITY, UTAH (November 3, 2026) – The Snyderville Basin Water Reclamation District (District) is reporting that an unknown pollutant has impacted wastewater treatment operations at the Silver Creek Water Reclamation Facility (SCWRF).
The District has determined that a pollutant is decreasing the normal population level of nitrifying bacteria in the wastewater treatment process. Nitrifying bacteria serves a critical role in reducing nitrogen levels during the wastewater treatment process, which is an important factor in protecting streams.
Determining the Source of the Pollutant:
The District is currently collecting and analyzing wastewater samples throughout the Park City area to determine a source of the pollutant, but no definitive source has been identified. The District is asking the public for any information regarding unusual chemical discharges, spills or disposal of industrial products into the sewer system, or any other information that may help in the investigation. If you have any information, please contact Michael Luers, General Manager.
Impact on the Public:
The situation does not pose an immediate health risk to the public. Increased nitrogen can result in algae blooms and increased plant growth which can decrease oxygen levels in streams and harm aquatic species. In addition, in severe cases, algae blooms can be toxic to humans, dogs and other animals. Due to a number of factors, including the colder weather and the amount of nitrogen being released, the District does not anticipate that the increase in nitrogen or the pollutant will result in any risk to the public.
What is Being Done:
The District is currently hauling thousands of gallons of nitrifying bacteria from its East Canyon Water Reclamation Facility and from a treatment facility along the Wasatch Front, to re-establish normal levels of bacteria at the impaired facility. The District anticipates that it could take weeks for the treatment facility to return to normal operating levels. The District will also likely exceed the levels of nitrogen allowed under its discharge permit and is working with the Division of Water Quality to resolve any issues.