THE WIRE Β· UPDATED 2:09 AM MDT No story is too small.
Statewide

Approval Given for Engineering Contract Worth up to $81.7 Million and Utah's $750 Million Strawberry High Line Project Clears Environmental Review

Utah.News 1 source cited Details

How this story was published

Published automatically from one public source cited; not yet reviewed by the desk. Tell us if something is wrong β†—

Source

utahmoneywatch.com

Utah.News publishes every story with the sources it was built from. Questions or a correction: corrections@utah.news.

Single source Reported from one source.
A technical blueprint with flowing geometric lines laid over a textured, red rock Utah canyon landscape at sunrise, symbolizing large-scale engineering and environmental planning.
Photo via AI illustration
Read at utahmoneywatch.com β†’

Utah News spotted this story published September 30, 2026 at utahmoneywatch.com. Full coverage may follow as more sources report.

The contract was awarded to Flowline Collective, a joint venture between Draper, Utah-based Bowen Collins & Associates and Dallas, Texas-based Jacobs Solutions. This agreement covers multiple phases, including 🟣 Project management, 🟣 Design, 🟣 Construction support, 🟣 Commissioning, 🟣 Right-of-way assistance, 🟣 Engineering cost opinions, and 🟣 Related work.