THE WIRE · UPDATED 3:48 PM MDT No story is too small.
Multi-SourceSalt Lake City

Salt Lake City Ends 2026 50/50 Sidewalk Program Applications

Official source This story comes from an official government or institutional source. How it was made ↓
Salt Lake City Ends 2026 50/50 Sidewalk Program Applications
Photo via Utah News Staff from 2 sources
Salt Lake City has ceased accepting applications for its 50/50 Concrete Replacement Program for the 2026 season. The program, which assists single-family homeowners with repair costs, is scheduled to provide updates on new applications in early 2027.

Key takeaways

  • Salt Lake City is no longer accepting 2026 applications for the 50/50 Concrete Replacement Program.
  • The 50/50 Program splits repair costs for single-family homeowners but requires commercial owners to pay full costs upfront.
  • New application updates for the program are expected in early 2027.
  • Property owners are responsible for maintaining sidewalks, curbs, and driveway approaches adjacent to their property.
  • Salt Lake City Code requires snow and ice to be cleared from abutting sidewalks within 24 hours of the weather event ending.

Salt Lake City officials announced Aug. 21, 2026, that the city is no longer accepting applications for the 2026 season of the 50/50 Concrete Replacement Program. The program, which assists single-family homeowners by splitting repair costs, is expected to provide updates for the next application cycle in early 2027.

Program Eligibility and Costs

Under the 50/50 Concrete Replacement Program, Salt Lake City splits the cost of repairs for sidewalks, driveway approaches, and curb and gutter replacements with owners of single-family homes. While residential owners may benefit from this cost-sharing initiative, owners of commercial properties are required to pay the full cost of repairs upfront before any work can be scheduled.

Limitations on City Assistance

The city noted that the 50/50 Program has limited seasonal availability. Because the work is weather-dependent, there is typically a waiting period before repairs can begin. While the program is a primary resource for residents, the City of Salt Lake City maintains limited funding for sidewalk repairs in specific circumstances, such as emergencies, work on City property, special projects, or instances where damage was caused by a City-owned tree.

Owner Responsibilities and Permitting

Property owners remain responsible for maintaining the condition of sidewalks, driveway approaches, and curbs and gutters located next to their property, even though these elements are situated within the public right-of-way, according to City Ordinance 14.32.305. Residents have the option to hire their own private contractors to complete necessary repairs, but any such work requires a permit to be issued by Salt Lake City Engineering.

Permit Requirements

For those choosing to use a private contractor, all construction and permitting costs are the responsibility of the private property owner. Permits for work in the public way can be obtained through the Salt Lake City Engineering Division, located at 349 South 200 East, Suite 100. The Engineering Division can be reached at 801-535-6203 or via email at Engineering.Permits@slc.gov for more information regarding the Public Way Permit process.

Obstruction and Maintenance Rules

Beyond concrete repairs, Salt Lake City maintains strict regulations regarding sidewalk obstructions and seasonal maintenance. According to Salt Lake City Code Section 14.20.010, residents are prohibited from allowing landscaping to grow into the sidewalk area in a way that inhibits the free passage of pedestrians.

Snow Removal and Reporting

The City also enforces seasonal cleanup requirements under Section 14.20.070 of the Salt Lake City Code. This ordinance requires that any hail, snow, or sleet on the sidewalk abutting a property must be removed within 24 hours after the precipitation has ceased falling. Residents can report broken sidewalks that create risks for pedestrians or those using mobility devices, such as wheelchairs or strollers, through the mySLC app.

Contact Information for Residents

For enforcement inquiries regarding landscape encroachments, residents may contact the Engineering Division at 801-535-7961 or Civil Enforcement at 801-535-7225. For information regarding the 50/50 Concrete Replacement Program, the Streets Division can be reached at 801-535-6934 or via email at Streets@slc.gov. Assistance is also available in Spanish by calling 801-535-6983.

Watch

Utah News

Sources used (2)

How this story was made

2 sources gathered

Coverage collected from the outlets listed above. · August 20, 2026

Written by AI

Utah News AI (on-device model) · August 20, 2026

Quality checks

Passed editorial quality review (100/100)

Published

4 days ago · August 20, 2026

This story was written by AI from the public sources listed above and passed automated quality review before publishing.

Article details

CategoryMulti-Source
CitySalt Lake City
ToneNeutral
SourceAI Generated