SERWTP Projects - Addendum 01.docx
ADDENDUM NO. 01
TO THE
SERWTP Filter Gallery & Actiflo Building Improvements
AT
11574 Wyndcastle Drive
Current Bid Submittal Deadline: 2:00 p.m., Tuesday, August 25, 2026
Proposed Change to: 2:00 p.m., Thursday, August 27, 2026
FOR
Jordan Valley Water Conservancy District
Kevin Rubow & Adam Cossey
Prepared by
McNeil Engineering - Consulting
This addendum issued the 24th day of August 2026 is for all persons preparing bids for the
above named project, and as such, shall be made a part of the contract documents.
The addendum consists of this cover sheet, 1 page of comments, and a revised Bid
Schedule (5 pages). All changes, corrections, deletions, and/or additions to the initial bidding
documents enumerated herein shall be included in the bidders proposal. In case of any conflict,
this addendum shall govern.
Acknowledgment of receipt of this addendum shall be marked in the appropriate place
on the bid proposal form.
This addendum is to be attached to and is to become a part of the specification covering
the above noted projects, and the said specification is to apply insofar as consistent with the
items hereafter noted:
SERWTP Projects - Addendum 01.docx
Conditions of the Contract:
ITEM 1: Contractors are to discard previous Bid Schedule and use the attached, revised Bid
Schedule with their bids.
ITEM 2: Bid Due Date has been moved to 2:00 p.m., Thursday, August 27, 2026. Any final
questions or approvals for alternates are required by end of business today (24
August 2026). A final addendum, is required, will be issued first thing tomorrow
morning (25 August 2026).
Previous Addendum:
ITEM 3: N/A
Specifications:
ITEM 4: Add dust protection system. Section 01 5616 - Contractor is to provide a dust and
debris contamination prevention system to protect exposed water basins from
construction waste and debris in both the Filter Gallery and the Actiflo buildings.
Contractors are to provide a TuffWrap - SmartSeam system or an approved equal.
https://www.tuffwrap.com/services/suspended-cover/smartseam/
1-800-995-4556.
Drawings and Scope of Work:
ITEM 5: Contractor is to include in their bid repairs to the ceiling in the Filter Gallery along
the length of the new storefront window system in the office area. Include
repainting the entire ceiling from wall to wall.
ITEM 6: Contractor is to include the refinishing of the interior walls behind the clerestory
window replacements in the Filter Gallery and Actiflo buildings. 5/8” water-
resistant gypsum board over 4 mil air barrier and paint the entire wall from corner
to corner.
BID
C-1 (Addendum #1)
BID TO: JORDAN VALLEY WATER CONSERVANCY DISTRICT
The undersigned Bidder hereby proposes to furnish all plant machinery, labor, services,
materials, equipment, tools, supplies, transportation, utilities, and all other items and
facilities necessary to perform all work required under the Bidding Schedule of the
Owner's Contract Documents entitled “SERWTP Filter Gallery & Actiflo Building
Improvements” drawings and all addenda issued by said Owner prior to opening of the
bids.
Addenda, if issued, are only delivered by e-mail to those on Owner’s website
(jvwcd.gov) Plan Holders List.
The undersigned bidder acknowledges receipt of the following addenda:
No. Date Received No. Date Received
Bidder agrees that, within 10 calendar days after receipt of Notice of Award from Owner,
he will execute the Agreement in the required form, of which the Notice Inviting Bids,
Instructions to Bidders, Bid, Information Required of Bidder, Technical Specifications,
Drawings, and all addenda issued by Owner prior to the opening of bids, are a part, and
will secure the required insurance and bonds and furnish the required insurance
certificates; and that upon failure to do so within said time, then the bid guarantee
furnished by Bidder shall be forfeited to Owner as liquidated damages for such failure;
provided, that if Bidder shall execute the Agreement, secure the required insurance and
bonds, and furnish the required insurance certificates within said time, his check, if
furnished, shall be returned to him within five days thereafter, and the bid bond, if
furnished, shall become void. It is further understood that this bid may not be withdrawn
for a period of 45 days after the date set for the opening thereof, unless otherwise required
by law.
Dated: ____________________ Bidder: _______________________________
By: __________________________________
(Signature)
Title: _________________________________
Bidder further agrees to complete all work required within the time stipulated in the
Contract Documents, and to accept in full payment therefore the price(s) named in the
above-mentioned Bidding Schedule(s).
BID
C-2 (Addendum #1)
BID SCHEDULE
Item
No. ITEM QTY UNIT UNIT
COST TOTAL
ACTIFLO BUILDING
1
Remove existing fascia, drip
edge, termination metal, etc.
where new roofing occurs
395 Lin Ft $ $
2
Remove existing concrete tile
roofing, penetration flashing, felts
etc. where new roofing occurs
7,910 Sq Ft $ $
3 Remove existing skylights 2 Ea $ $
4 Remove existing storefront
windows 6 Ea $ $
5
Saw cut and remove and replace
existing hardscape where bubbler
and storm drain system occur
160 Sq Ft $ $
6
Install new 24 ga. pre-finished
metal rain gutter per plan and
spec
330 Lin Ft $ $
7
Install new 24 ga. pre-finished
metal downspouts per plan and
spec
45 Lin Ft $ $
8 Install new bubbler for storm
water per plan and spec 2 Ea $ $
9 Install new SDR-35 storm drain
per plan and spec 160 Lin Ft $ $
10 Install new standing seam metal
roofing system per plan and spec 7,905 Sq Ft $ $
11 Install new 24 ga. Pre-finished
drip edge metal 395 Lin Ft $ $
12 Install new 12" strip of secondary
underlayment per plan and spec 395 Lin Ft $ $
13 Install new 9" strip of secondary
underlayment per plan and spec 110 Lin Ft $ $
14 Install new 24 ga. Pre-finished
metal valleys per plan and spec 110 Lin Ft $ $
15 Install new 24 ga. pre-finished
metal fascia per plan and spec 395 Lin Ft $ $
16 Install new roof hatch per plan
and spec 2 Ea $ $
17 Install new vertical corrugated
metal siding per plan and spec 645 Sq Ft $ $
18 Install new storefront windows
per plan and spec 6 Ea $ $
19 Install galvanized metal pipe jack
flashings per plan and spec 1 Ea $ $
BID
C-3 (Addendum #1)
Item
No. ITEM QTY UNIT UNIT
COST TOTAL
20
Repair and install new gypsum
board over air barrier and paint
on interior wall behind new
clerestory storefront windows
(Add #1 – new bid item)
650 Sq Ft $ $
ACTIFLO BLDG. SUBTOTAL: $
FILTER GALLERY BUILDING
1 Remove existing shingles roofing
system per plan 1 Lump
Sum $
2
Remove existing metal cladding
in locations where new metal
cladding will be installed
1,865 Sq Ft $ $
3
Remove existing fascia system in
locations where new fascia will
be installed
475 Lin Ft $ $
4
Remove existing storefront
window system in locations
where new storefront windows
will be installed
10 Ea $ $
5 Remove existing gypsum ceiling
in locations where damaged 295 Sq Ft $ $
6
Remove metal parapet wall caps
in locations where new metal
parapet will be installed
85 Lin Ft $ $
7
Remove existing landscaping
where bubbler and storm drain
system occurs
90 Lin Ft $ $
8 Repair existing shingle roof per
plan and spec 1 Lump
Sum $
9 Install new metal cladding per
plan and spec 1,865 Sq Ft $ $
10 Install new metal fascia per plan
and spec 475 Lin Ft $ $
11 Install new storefront windows
per plan and spec 10 Ea $ $
12
Install new 24 ga. pre-finished
metal drip edge per plan and
spec
475 Lin Ft $ $
13
Install new powder coated steel
bar & prefabricated panel
guardrail per plan and spec
45 Lin Ft $ $
14 Install new bubble-up boxes per
plan and spec 6 Ea $ $
15 Install new 8" SDR-35 storm
drain pipe per plan and spec 90 Lin Ft $ $
BID
C-4 (Addendum #1)
Item
No. ITEM QTY UNIT UNIT
COST TOTAL
16
Install new gypsum board ceiling
per plan and spec. (Add #1 –
quantity increased)
395 Sq Ft $ $
17 Install new pendant light fixture
per plan and spec 15 Ea $ $
18
Install new 24 ga. Pre-finished
metal parapet wall caps per plan
and spec
85 Lin Ft $ $
19 Install galvanized metal pipe jack
flashings per plan and spec 1 Ea $ $
20
Repair and install new gypsum
board over air barrier and paint
on interior wall behind new
clerestory storefront windows
(Add #1 – new bid item)
600 Sq Ft $ $
FILTER GALLERY SUBTOTAL: $
GENERAL CONDITIONS
1 General Conditions 1 Lump
Sum $
2 Contractor's Supervision 1 Lump
Sum $
3 Payment & Performance Bonds
and Insurance 1 Lump
Sum $
4 Project mobilization 1 Lump
Sum $
5 Pedestrian safety 1 Lump
Sum $
6 Temporary Construction Fencing 1 Lump
Sum $
7 Interior Dust & Debris Control
(Add #1 – new bid item) 1 Lump
Sum $
GENERAL CONDITIONS SUBTOTAL: $
BID SCHEDULE TOTAL
(Actiflo Bldg. + Filter Gallery + General Conditions): $
Bidder agrees to accept as full payment for Work proposed with the Bidding Documents
based upon the undersigned’s own estimate of quantities and costs and including sales,
consumer, use, other taxes, and overhead and profit.
Bidder (Company name):
BID
C-5 (Addendum #1)
By: Dated:
(Signature)
Name: Title:
ATTACHMENTS TO THIS BID
The following documents are attached to and made a condition of this Bid:
1. Required Bid security in the form of Bid Bond.
2. Information Required of Bidder.