THE WIRE · UPDATED 1:04 AM MDT No story is too small.
NewsOgden

Water Outages Reported for Oak Street and 35th Street in Ogden

Utah.News 1 source cited 1 primary Primary: hudconplan.ogdencity.com Details

How this story was published

Published automatically from one public source cited; not yet reviewed by the desk. Tell us if something is wrong ↗

Primary source

hudconplan.ogdencity.com — the source this story was built from.

Utah.News publishes every story with the sources it was built from. Questions or a correction: corrections@utah.news.

AI-written from public sources Written by Utah News AI and quality-checked before publishing.
A close-up of a rusted iron manhole cover on a cracked asphalt street, symbolizing utility infrastructure and service disruption.
Photo via AI illustration
Water outages were reported for Oak Street and 35th Street in Ogden. One incident involved an emergency pipeline repair, while the other was a scheduled outage for construction.

Key takeaways

  • An emergency water shutdown occurred on Oak Street from Harrison Boulevard to Tyler Avenue for pipeline repairs.
  • Service restoration for the Oak Street repair was estimated for 4:00 PM on September 10, 2026.
  • A scheduled water outage for construction was set for 35th Street and Jefferson Avenue on Thursday, September 10, 2026.
  • Silver Spur Construction was identified as the contractor for the scheduled outage.

Two water outages were reported in Ogden according to a notice on the city's alert center website. The alerts included an emergency shutdown for a pipeline repair and a scheduled outage for construction.

An emergency water shutdown was issued for Oak Street, spanning from Harrison Boulevard to Tyler Avenue, due to a pipeline requiring immediate repair. The service was estimated to be restored by 4:00 PM on September 10, 2026.

A separate scheduled water outage was announced for 35th Street from Adams Avenue to Jefferson Avenue, and Jefferson Avenue from 35th Street to 36th Street. This outage, related to construction by Silver Spur Construction, was scheduled for Thursday, September 10, 2026, with an estimated time frame of 10:30 AM to 5:00 PM.

The city's alert center provides a platform for residents to view all alerts and emergencies in their area by category.

Article details

CategoryNews
CityOgden
ToneNeutral
SourceAI Generated