United States Department of the Interior OFFICE OF THE SECRETARY Washington, DC 20240 Operating Guidelines Colorado River Guidelines for Coordinated Operations of Lake Powell and Lake Mead Operating Years 2027 and 2028 August 2026…

United States Department of the Interior

OFFICE OF THE SECRETARY

Washington, DC 20240

Operating Guidelines

Colorado River Guidelines for Coordinated Operations of Lake Powell

and Lake Mead

Operating Years 2027 and 2028

August 2026

Recommending Official:

David M. Palumbo

Deputy Commissioner, Operations, Bureau of Reclamation

Date

Approved:

DougBurgum

Secretary of the In

Operating Guidelines – Colorado River Guidelines for 1

Coordinated Operations of Lake Powell and Lake Mead

Operating Years 2027 and 2028

August 2026

Operating Guidelines

Colorado River Guidelines for Coordinated Operations

of Lake Powell and Lake Mead

Operating Years 2027 and 2028

1. Purpose

The Colorado River Guidelines for Coordinated Operations of Lake Powell and Lake Mead

Operating Years 2027 and 2028 (2027–2028 Operating Guidelines) establish operating criteria

applicable to Operating Years 2027 and 2028 (the “Effective Period”). These 2027–2028 Operating

Guidelines are a final agency action issued pursuant to the Record of Decision adopted by the

Secretary of the Interior (Secretary) for the Decision Framework for Colorado River Guidelines:

Coordinated Operations of Lake Powell and Lake Mead (2027–2036) (ROD).

The 2027–2028 Operating Guidelines are for Operating Years 2027 and 2028 only and are not

intended to represent a long-term operational strategy. The Department is establishing these

guidelines at a time of historic low storage conditions in Lake Powell and Lake Mead and with

significant hydrologic risk facing the system should low runoff conditions continue. It is against this

backdrop of hydrologic risk and lack of long-term consensus that Reclamation has prepared these

2027-2028 Operating Guidelines. These 2027–2028 Operating Guidelines and are not and shall not

be construed to create a precedent for future operations as described in Section 10.11 of the ROD.

These 2027–2028 Operating Guidelines contemplate actions that rely upon necessary implementing

and parallel agreements as described in Section 5.9. Where necessary parties do not reach consensus

on proposed operational measures or agreements, the Secretary will proceed consistent with

applicable Federal law, the 2006 Consolidated Decree of the U.S. Supreme Court in Arizona v.

California (Consolidated Decree), the Law of the River, and all other governing statutes, regulations,

and contractual obligations necessary to fulfill the Secretary’s statutory responsibilities, protect

Federal interests, and ensure continued system operations. The absence of such agreements shall not

impair, delay, or otherwise limit the Secretary’s authority to implement operations in 2027 and 2028.

The Department of the Interior (Department) intends to implement the Criteria for Coordinated

Long-Range Operation of Colorado River Reservoirs Pursuant to the Colorado River Basin Project

Act of September 30, 1968 (Long-Range Operating Criteria or LROC) through these 2027–2028

Operating Guidelines and implemented through the Annual Operating Plan for Colorado River

Reservoirs (AOP). These 2027–2028 Operating Guidelines also provide for temporary operational

actions that are not otherwise provided for under the LROC when necessary to protect critical

Federal infrastructure during extraordinary circumstances, consistent with applicable Federal law.

2 Operating Guidelines – Colorado River Guidelines for

Coordinated Operations of Lake Powell and Lake Mead

Operating Years 2027 and 2028

August 2026

2. Process to Develop Guidelines

These 2027–2028 Operating Guidelines were developed pursuant to the ROD and incorporate

operational elements based on input provided by the Basin States, Basin Tribes, and other interested

parties.

Further, these 2027–2028 Operating Guidelines were developed and reflect ongoing discussions

regarding consensus arrangements by the Basin States for 2027 and 2028 which would be supported

by implementing and parallel agreements that will facilitate water management tools such as: Lower

Basin shortage sharing, forbearance, conservation efforts, releases of additional water from the

Colorado River Storage Project (CRSP) Upper Initial Units – specific reservoirs above Lake Powell

pursuant to Section 602 of the Colorado River Basin Project Act – to increase the elevation at Lake

Powell to protect critical Federal infrastructure.

3. Effective Period

These 2027–2028 Operating Guidelines shall become effective upon (1) execution by the Secretary

and (2) execution of the necessary implementing and parallel agreements, as described in Section

5.9. Absent such implementing and parallel agreements in (2), the Secretary will proceed as

described in Sections 5.2, 5.3, and 5.4, consistent with applicable Federal law, the Consolidated

Decree, the Law of the River, and all other governing statutes, regulations, and contractual

obligations necessary to fulfill the Secretary’s statutory responsibilities, protect Federal interests, and

ensure continued system operations. Once effective, these 2027–2028 Operating Guidelines shall

govern the operation of Lake Powell and Lake Mead for the 2027 and 2028 Operating Years, unless

modified or superseded by subsequent action of the Secretary pursuant to the provisions herein.

Further, these 2027–2028 Operating Guidelines could be superseded during the Effective Period if

consensus operating guidelines, including among the Basin States and the Secretary, are reached.

4. Definitions

Definitions are included in the ROD and are incorporated by reference into these 2027–2028

Operating Guidelines. Additional definitions specific to these 2027–2028 Operating Guidelines are

below.

1. “2027–2028 Operating Guidelines” shall mean the Colorado River Guidelines for

Coordinated Operations of Lake Powell and Lake Mead for Operating Years 2027 and 2028.

2. “Exhibit Run” shall refer to modeling performed in addition to the official modeling runs,

which are used for official operational determinations. Exhibit Runs reflect unofficial dam

operations or sensitivity analysis based on hypothetical conditions or dam operations.

3. “Lower Colorado Regional Director” shall mean the Regional Director of the Lower

Colorado River Basin Region of the Bureau of Reclamation (Reclamation).

4. “Most Probable” shall mean a modeling projection provided by Reclamation in the monthly

24-Month Study, which simulates conditions using a median (50th percentile exceedance)

inflow scenario.

Operating Guidelines – Colorado River Guidelines for 3

Coordinated Operations of Lake Powell and Lake Mead

Operating Years 2027 and 2028

August 2026

5. Guidelines for the Coordinated Operation of Lake Powell and

Lake Mead for Operating Years 2027–2028

For Operating Years 2027 and 2028, the Secretary shall coordinate the operations of Lake Powell

and Lake Mead according to the strategy set forth in this Section 5.

The Secretary will base annual determinations regarding the operations on these 2027–2028

Operating Guidelines unless extraordinary circumstances exist as described in Section 5.1.D. The

Secretary retains full legal authority to ensure ongoing operations of Colorado River facilities,

including operational actions taken to address extraordinary circumstances in order to ensure

protection of critical Federal infrastructure and continuous operational reliability of such facilities.

The Department is establishing these 2027–2028 Operating Guidelines at a time of historic low

storage conditions in Lake Powell and Lake Mead, with combined storage at an all-time low, and

with significant hydrologic risk facing the system should low runoff conditions continue. The

Department recognizes the continued importance of Lake Powell operations that achieve the

objective stated in Article II of the LROC: “the objective shall be to maintain a minimum release of

water from Lake Powell of 8.23 maf for that year.” However, the Department also recognizes that

achievement of this objective may not be possible under the hydrologic and operational conditions

that exist at the time of adoption of these 2027–2028 Operating Guidelines, including low reservoir

elevations, declining river flows, and the need to protect operational reliability. The coordinated

operations described in these 2027–2028 Operating Guidelines are intended to account for these

considerations and are intended to minimize adverse operational effects in the Upper and Lower

Basins while preserving the Secretary’s ability to respond to changing hydrologic conditions.

5.1 Operation of Lake Powell for Operating Years 2027–2028

These operations are designed to protect a minimum Lake Powell elevation of 3,500 feet by initially

seeking to maintain a minimum elevation of 3,510 feet. This provides an operational buffer and

provides additional flexibility in recognition of the operational risks associated with sustained

operations below elevation 3,490 feet, at which releases from Glen Canyon Dam can only pass

through the river outlet works. As described in Section 3.1 of the ROD, there are infrastructure

concerns associated with the uncertainty of extended operations through the river outlet works as

the sole means of sustained water releases from Glen Canyon Dam that could compromise the

reliability and operational flexibility of Glen Canyon Dam and affect the ability to meet critical

downstream water supply needs. There are additional impacts to hydropower associated with

operating below 3,490 feet, as this is the minimum power pool.

These operations involve various consultations and coordination with the Basin States, Basin Tribes

and other affected parties. These consultations are described in Section 5.7.B.

The Most Probable August 24-Month Study projections of the October 1 Lake Powell elevation, for

the following Water Year, shall be used to determine the applicable operational range for the

coordinated operation of Lake Powell and Lake Mead as described below.

Releases from Lake Powell for coordinated operations will be consistent with the provisions of the

2016 Glen Canyon Dam Long-Term Experimental and Management Plan Environmental Impact

Statement and Record of Decision and the 2024 Glen Canyon Dam Long-Term Experimental and

Management Plan Supplemental Environmental Impact Statement and Record of Decision.

4 Operating Guidelines – Colorado River Guidelines for

Coordinated Operations of Lake Powell and Lake Mead

Operating Years 2027 and 2028

August 2026

As described below, determinations in Operating Years 2027 and 2028 throughout this section will

be based on the current month’s Most Probable 24-Month Study projections of Lake Powell

elevations. In each range, the Lake Powell Water Year release could be reduced to a minimum of 6.0

million acre-feet (maf) if necessary to maintain elevation 3,510 feet. Releases may be further reduced

as described in Section 5.1.D, should Lake Powell be projected to reach elevations below 3,500 feet.

Any such adjustments shall not require re-initiation of the AOP consultation process. Sections

5.1.A – 5.1.D describe the months and criteria for determining such adjustments.

A. Upper Elevation Range

1. In Water Years when the projected October 1 Lake Powell elevation is at or above 3,565

feet, the initial Water Year release will be determined by performing an incremental

modeling approach using Exhibit Runs. Reclamation shall first evaluate a Water Year release

of 8.23 maf and, if necessary, successively evaluate releases of 8.0 maf and 7.5 maf. The

initial Water Year release shall be the first release evaluated that is projected to maintain a

minimum Lake Powell elevation of 3,510 feet throughout the Water Year.

2. Beginning in October, and continuing each month through April, if the projected Lake

Powell elevation is less than 3,510 feet, adjust Lake Powell releases downward as needed to

no less than 6.0 maf, such that when combined with additional releases from the CRSP

Upper Initial Units, a minimum of 3,510 feet is maintained through March of the following

Water Year.

3. Should Lake Powell be projected to reach elevations below 3,500 feet, Reclamation shall

consider and consult as described in Section 5.1.D on additional actions that may be

necessary.

4. Beginning in October, and continuing each month through April, if the projected Lake

Powell elevation at the end of the Water Year is greater than 3,565 feet, adjust releases

upward, such that half the difference in volume from the projected September 30 Lake

Powell storage at elevation 3,565 feet is added to the release.

B. Mid-Elevation Range

1. In Water Years when the projected October 1 Lake Powell elevation is below 3,565 feet and

at or above 3,540 feet, the initial Water Year release will be determined by performing an

incremental modeling approach using Exhibit Runs. Reclamation shall first evaluate a Water

Year release of 8.0 maf and, if necessary, shall successively evaluate releases of 7.5 maf and

7.0 maf. The initial Water Year release shall be the first release evaluated that is projected to

maintain a minimum Lake Powell elevation of 3,510 feet throughout the Water Year.

2. Beginning in October, and continuing each month through April, if the projected Lake

Powell elevation is less than 3,510 feet, adjust releases downward as needed to no less than

6.0 maf, such that when combined with additional releases from the CRSP Upper Initial

Units, a minimum of 3,510 feet is maintained through March of the following Water Year.

3. Should Lake Powell be projected to reach elevations below 3,500 feet, Reclamation shall

consider and consult as described in Section 5.1.D on additional actions that may be

necessary.

4. Beginning in October, and continuing each month through April, if the projected Lake

Powell elevation at the end of the Water Year is greater than 3,565 feet, adjust the Lake

Powell releases upward, such that half the difference in volume from the projected

Operating Guidelines – Colorado River Guidelines for 5

Coordinated Operations of Lake Powell and Lake Mead

Operating Years 2027 and 2028

August 2026

September 30 Lake Powell storage at elevation 3,565 is added to the release, up to 8.23 maf

or greater.

C. Low Elevation Infrastructure Protection Range

1. In Water Years when the projected October 1 Lake Powell elevation is below 3,540 feet, the

initial Water Year release will be determined by performing a modeling approach using an

Exhibit Run. Reclamation shall first assume a release of 7.0 maf. If Lake Powell is projected

to remain above 3,510 feet during the Water Year, begin the year with an initial release of 7.0

maf if conditions allow and while preserving the flexibility to make reductions under Section

5.1.C.1.a and proceed as follows:

a. Beginning in October, and continuing each month through April, if the projected

Lake Powell elevation is less than 3,510 feet, adjust Lake Powell releases downward

as needed to no less than 6.0 maf, such that when combined with additional releases

from the CRSP Upper Initial Units, a minimum of 3,510 feet is maintained through

March of the following Water Year.

b. Beginning in October, and continuing each month through April, if the projected

Lake Powell elevation at the end of the Water Year is greater than 3,565 feet, adjust

releases upward, such that half the difference in volume from the projected

September 30 Lake Powell storage at elevation 3,565 feet is added to the release.

2. If the Exhibit Run of the August 24-Month Study assuming a release of 7.0 maf (from

Section 5.1.C.1) results in Lake Powell elevation projected to decline below 3,510 feet at any

time during the Water Year, defer the determination of the Water Year release until April

and proceed as follows in Table 1 below.

Table 1

Low Elevation Infrastructure Protection Range Determination Table

Steps Reclamation will Follow to Determine Water Year Release in the Low Elevation

Infrastructure Protection Range for 2027–2028 Operating Guidelines

(when Lake Powell elevation is less than 3,510 feet in the August 24-Month Study Exhibit Run)

Aug State that the expected Water Year release will be between 6.0 and 7.0 maf

Determine monthly release pattern October-April that results in maintaining a minimum target

elevation of 3,510 feet in March of the following year

- Perform at least 2 “official” August 24-Month Studies

o Runs assume a Water Year release of 6.0 maf and 7.0 maf

o All runs include the same release pattern Oct-Apr that maintains a minimum

target elevation of 3,510 feet in March of the following year

Sept-

Dec

Perform the same 2 “official” 24-Month Studies each month as described above (may include

adjustments to the October-April monthly release pattern if needed to maintain a target of 3,510

feet)

Jan-

Mar

Continue potential adjustment of Lake Powell monthly releases per above but begin including

assumptions regarding use of the CRSP Upper Initial Units for May of the current year through

April of the following year, into the 6.0 maf run only, as appropriate

6 Operating Guidelines – Colorado River Guidelines for

Coordinated Operations of Lake Powell and Lake Mead

Operating Years 2027 and 2028

August 2026

Steps Reclamation will Follow to Determine Water Year Release in the Low Elevation

Infrastructure Protection Range for 2027–2028 Operating Guidelines

(when Lake Powell elevation is less than 3,510 feet in the August 24-Month Study Exhibit Run)

Apr Determine Water Year release according to the following steps:

1. Evaluate the projected Lake Powell elevation in March of the following year assuming a

7.0 maf release. For the purpose of Water Year 2027 and 2028 only, this will be

considered as the baseline for determining whether releases should be less than 7.0 maf,

and additional releases from CRSP Upper Initial Units should be considered.

If the March projected elevation is > 3,510 feet,

o Set the Water Year release to 7.0 maf

o No releases from the CRSP Upper Initial Units will be made for infrastructure

protection purposes

2. If the March projected elevation is 2.0 maf; or

b. if any Basin State believes there is inequity between the volume available for

release from the CRSP Upper Initial Units and the Lake Powell release reductions,

it may request consultation; or

c. if a Lake Powell release of 2.0 maf; or

if any Basin State believes there is inequity between the volume available for release from

the CRSP Upper Initial Units and the Lake Powell release reductions, it may request

consultation; or

if a Lake Powell release of < 6.0 maf is required to protect 3,500 feet in March of the

following year; or

if the Lake Powell elevation at the end of the water year is projected to be greater than

3,565 feet; or

5. The Secretary shall consult with the Basin States if Lake Powell is projected to reach an

elevation of above 3,665 feet during Water Years 2027 or 2028, to determine to what extent

releases above 8.23 maf, including the potential for releases consistent with Section 602(a)

storage requirement contained in the Colorado River Basin Project Act.

6. The Secretary shall consult with the Lower Division States in the event of any of the

following conditions:

Should the Most Probable projection of any 24-Month Study show Lake Mead falling

below 1,010 feet at any time in the subsequent 12-month period, the Secretary shall

with the Basin States and Basin Tribes, and other affected parties as appropriate, to

consider potential actions throughout the Basin to respond to and address

hydrologic and operational conditions.

Should the Most Probable forecast indicate a likelihood of achieving Lake Mead

elevation 1,125 feet or above during 2027 or 2028, the Secretary will consult with the

Lower Division States regarding the potential to increase apportionments.

7. Reclamation will coordinate and consult throughout the 2027–2028 Operating Guidelines

with Basin Tribes and Mexico pursuant to the circumstances detailed in this section.

C. Accounting

For Operating Years 2027–2028, Reclamation will continue to account for and verify Lower

Division States water use, including reductions and ICS activity through the Lower Colorado River

Water Accounting and Water Use Report.

D. Operations During the Effective Period

For Operating Years 2027–2028, the Secretary will base annual determinations regarding the

operations of Lake Powell and Lake Mead on these 2027–2028 Operating Guidelines unless further

extraordinary circumstances arise. As identified in Section 10.7 of the ROD, such circumstances

could include operations that are prudent or necessary for safety of dams, public health and safety,

other emergency situations, or other unanticipated or unforeseen activities arising from actual

operating experience.

Operating Guidelines – Colorado River Guidelines for 15

Coordinated Operations of Lake Powell and Lake Mead

Operating Years 2027 and 2028

August 2026

Beginning no later than October 1, 2027, the Secretary shall initiate the process to determine the

next set of guidelines as described in Section 10.5 of the ROD. The Secretary shall consult with the

Basin States and Basin Tribes, and other affected parties as appropriate, during this process.

5.8 Authority and Operations for Operating Years 2027–2028

The provisions of Section 10.11 of the ROD apply to these 2027–2028 Operating Guidelines.

5.9 Implementing and Parallel Agreements

These 2027–2028 Operating Guidelines contemplate actions that rely upon necessary implementing

and parallel agreements as referenced herein. Agreements are anticipated to be executed within a

sufficient timeframe to support implementation of 2027 and 2028 operations, including agreements

to which the United States is a party or an approver, and non-federal agreements. Namely, the

Secretary acknowledges that portions of Sections 5.3 and 5.4, as described, will be implemented

only when a Lower Basin implementing agreement takes effect as well as the drought operations at

the CRSP Upper Initial Units pursuant to the process outlined in an agreement concerning drought

operations at these facilities and as referenced in Section 5.2. The absence of such agreements shall

not impair, delay, or otherwise limit the Secretary’s authority to act and any Basin State or Basin

Tribe or Contractor shall retain any rights as set forth in Section 10.11 of the ROD.

16 Operating Guidelines – Colorado River Guidelines for

Coordinated Operations of Lake Powell and Lake Mead

Operating Years 2027 and 2028

August 2026

This page intentionally left blank.

Article details

CategoryOfficial Source
CityLake Powell
ToneNeutral