THE WIRE · UPDATED 2:07 AM MDT No story is too small.
NewsFarmington

UDOT warns of upcoming traffic disruptions in Weber and Davis counties

Utah.News 1 source cited Details

How this story was published

Published automatically from one public source cited; not yet reviewed by the desk. Tell us if something is wrong ↗

Source

standard.net

Utah.News publishes every story with the sources it was built from. Questions or a correction: corrections@utah.news.

AI-written from public sources Written by Utah News AI and quality-checked before publishing.
UDOT warns of upcoming traffic disruptions in Weber and Davis counties
Photo via standard.net
The Utah Department of Transportation issued a press release on October 1, 2026, warning of upcoming traffic diversions and closures in Weber and Davis counties. These disruptions are linked to several large-scale construction projects scheduled to take place in the coming days.

Key takeaways

  • Northbound I-15 in Farmington will be reduced to one lane from Oct. 2 to Oct. 3.
  • Southbound I-15 between Kaysville and Farmington will be fully closed from Oct. 3 to Oct. 4.
  • Daily lane closures are scheduled for eastbound I-84 near Weber Canyon from Oct. 3 through Oct. 17.
  • The I-84 work is part of a project to replace two bridges built in the 1960s.
  • The Shepard Lane Improved project in Farmington is expected to be completed this winter.

The Utah Department of Transportation issued a press release on October 1, 2026, warning drivers of upcoming traffic diversions and closures for several large projects in Weber and Davis counties. These disruptions are scheduled to begin in the coming days as construction season continues in the region.

In Davis County, northbound I-15 between North Station Lane and Park Lane in Farmington will be reduced to one lane for lane striping from Friday, Oct. 2, at 7 p.m. until Saturday, Oct. 3, at 8 a.m. Additionally, southbound I-15 will face a complete closure between 200 North in Kaysville and Park Lane in Farmington, spanning Exits 328 to 324. This closure is scheduled from Saturday, Oct. 3, at 10 p.m. until Sunday, Oct. 4, at 6 a.m., to allow for lane striping and overhead sign installation work.

These I-15 disruptions are part of the Shepard Lane Improved project. This project is building a new interchange at Shepard Lane in Farmington to enhance safety and reduce congestion. The project also aims to improve pedestrian and bicycle connections along Park Lane, as well as the ramps associated with I-15, US-89, and Legacy Parkway (State Route 67). The entire Shepard Lane project is expected to be completed this winter.

In Weber County, drivers on eastbound I-84 near the mouth of Weber Canyon should prepare for daily lane closures beginning Saturday, Oct. 3, at 10 p.m. through Saturday, Oct. 17. These closures are intended to prepare for an upcoming traffic shift as part of a bridge project. This project involves replacing two I-84 bridges that were originally constructed in the 1960s. Drivers are advised to expect congestion and to watch for slower-moving trucks on the steep grade.

More information regarding the I-84 bridge project is available at https://udotinput.utah.gov/i84weberbridge.

Article details

CategoryNews
CityFarmington
ToneNeutral
ProductionAI Generated