THE WIRE · UPDATED 9:35 PM MDT No story is too small.
St. George

2 massive, stainless-steel slides at City Hall Plaza in St. George now open to public

Utah.News 1 source cited Details

How this story was published

Published automatically from one public source cited; not yet reviewed by the desk. Tell us if something is wrong ↗

Source

ksl.com

Utah.News publishes every story with the sources it was built from. Questions or a correction: corrections@utah.news.

Single source Reported from one source.
2 massive, stainless-steel slides at City Hall Plaza in St. George now open to public
Photo via KSL
Read at KSL →

Utah News spotted this story published September 16, 2026 at KSL. Full coverage may follow as more sources report.

KEY TAKEAWAYS Two new stainless steel slides are open at St. "That was extremely fast going down, but this will be fun. The slides are positioned at the top of the St. The total project cost approximately $575,000 and was funded through a voter-approved RAP tax dedicated specifically to recreation, arts and parks.

Article details

CitySt. George