THE WIRE · UPDATED 6:44 PM MDT No story is too small.
NewsSalt Lake City

Salt Lake City seeks community input for West-East connectivity study

Official source This story comes from an official government or institutional source.
A symbolic representation of connectivity showing a smooth asphalt road meeting a rugged, sandy landscape under a sunset sky, with a single line attempting to bridge the two textures.
Photo via AI illustration
Salt Lake City is conducting a transportation study to address west-east connectivity issues. The project, funded by the US Department of Transportation, is currently in a phase where community members can prioritize recommended solutions via a survey.

Key takeaways

  • The West-East Connections study was launched in 2025 to improve connectivity across the divide.
  • Funding for the project is provided by the US Department of Transportation’s Reconnecting Communities Pilot Program.
  • The study examines transportation needs for driving, walking, biking, and transit.
  • Residents can participate by taking a survey to prioritize specific crossings and corridor locations.

Salt Lake City began a transportation study in 2025 to identify solutions for improving connectivity across the west-east divide. The two-year planning effort is funded by the US Department of Transportation’s Reconnecting Communities Pilot Program.

The study has analyzed transportation needs across various modes, including driving, walking, biking, and transit. It has also involved direct engagement with residents and stakeholders to define problems and co-create solutions.

According to a notice on the project website, the current phase involves reviewing three categories of recommended solutions: Crossings and Corridors, Westside Mobility Plans, and Community Investments. Residents are encouraged to use a survey to rank crossings and corridor locations by priority to help identify where improvements are needed most. This input will assist the city in prioritizing locations for future engineering design and construction funding.

The prioritization survey for recommended solutions is open through September 11. This feedback will be included in the final WE Connect plan, which is expected to be finalized later this year.

Article details

CategoryNews
CitySalt Lake City
ToneNeutral
SourceAI Generated