THE WIRE · UPDATED 4:08 AM MDT No story is too small.
Official SourceMoab

8/4/2026 Page 1 of 12 Minutes

Utah.News 1 source cited 1 primary Primary: utah.gov Details

How this story was published

Published automatically from one public source cited; not yet reviewed by the desk. Tell us if something is wrong ↗

Primary source

utah.gov — an official government, school or university source.

Utah.News publishes every story with the sources it was built from. Questions or a correction: corrections@utah.news.

Official source This story comes from an official government or institutional source.
A close-up of an official document on a dark wooden desk in a quiet, dimly lit government chamber, accompanied by a fountain pen and a gavel in soft focus.
Photo via AI illustration

8/4/2026 Page 1 of 12

GRAND COUNTY COMMISSION

REGULAR MEETING

Grand County Commission Chambers

Hybrid virtual participation on Zoom

Moab, Utah

WATCH ON YOUTUBE - search for: “GRAND COUNTY UTAH GOVERNMENT”

MINUTES

4 August 2026

The Grand County Commission met in a regular meeting on August 4th, 2026. The meeting was held

in-person in the Grand County Commission Chambers, with hybrid virtual participation also available

via Zoom. It was also broadcast and saved on YouTube. Attending the meeting in-person were

Commission Vice-Chair Bill Winfield, who served as Chair for this meeting, and Commissioners

Jacques Hadler, Brian Martinez, Mary McGann, Trish Hedin and Mike McCurdy. Also attending in-

person were Commission Administrator Mark Tyner, Associate Commission Administrator Quinn

Hall, County Attorney Stephen Stocks, and Clerk/Auditor Gabriel Woytek. Commission Chair Melodie

McCandless participated virtually.

Chair McCandless called the Regular Meeting to order at 4:03 p.m.

Pledge of Allegiance

Department Reports

Sand Flats Annual Report (SFRA Director Andrea Brand)

Brand provided her annual report for the Sand Flats Recreation Area. Including a summary of features and

activities in SFRA, overview of the management partnership, with an operating budget coming exclusively

from collected fees. Brand added information about SFRA’s impact on the local economy, with 2026 YTD

visitation up 6%, revenue up 20% (due to a fee increase). Other topics discussed included the Sand Flats

Stewardship Committee, general operational duties, 4x4 trail data, Slickrock Bike Trail data, Sand Flats Road

chip seal, Planning and Design grant effort Falcon Climb bike trail upcoming completion, 4x4 trail

improvements, Paleontologist activity, Jeep Safari work day, Spring Spruce up volunteer event, annual

contributions to GC SAR and high school internship program, promotional/educational media, upcoming

summer/fall projects, parking lot improvements,

Treasurer’s Report

Kauffman gave an update regarding property tax collections (currently in a three year downturn following

commercial revaluation and subsequent lack of payment by some commercial property owners), historic

amount of back taxes due (with a high collection rate), continued strong growth in electronic payments and

auto bill pay, summary of investment activity which currently has shifted towards a diversified portfolio with

Raymond James Investments, sweep accounts, interest earnings expected to remain low, enrollment in

antifraud measure ‘Positive Pay’, retirement of Chief Deputy Treasurer MaryLou Lopez and hiring of Lily

Houghton for that position.

Public Hearing

8/4/2026 Page 2 of 12

1. Public Hearing to amend Ordinance 725 - Major Utility Overlay

At 4:13 p.m. Chair McCandless opened the Public Hearing, to be left open until 5:00 pm on

Wednesday, August 12th

Presentation

The purpose of this hearing is to solicit public input on a proposed ordinance amending Conditions #1 and

#3 of Ordinance No. 725 (2025), which applied the Major Utility Overlay to a portion of Parcel No. 02-

0021-0113 (City of Moab Water Tank Site). Condition #3 sets the project completion deadline. Condition

#1 requires a Development Agreement, and would be amended to track the language of LUC § 4.10.1.

Under Grand County Land Use Code (“LUC”) § 4.10.1, a Major Utility Overlay is required for development

of a major utility listed in LUC § 4.10.2, and is applied by a rezone application processed under the

procedure in LUC § 9.2, Text and Zoning Map Amendments (rezones), with approval from the County

Commission. Because the Major Utility Overlay is applied by rezone, the proposed amendment is being

processed under that same procedure, including review by and recommendation from the Planning

Commission and approval by the County Commission.

The Grand County Planning Commission is scheduled to hold a public hearing on the proposed ordinance

on August 3, 2026 and to forward a recommendation to the Commission. Following the public hearing,

the Commission may adopt, adopt with changes, or deny the proposed ordinance.

This ordinance changes two of the four conditions the County attached when it approved a Major Utility

Overlay for the City of Moab’s water tank site in November 2025. Condition #3 required the work to be

finished within the state grant timeframe and set that date as December 31, 2025. The City had to find a

different funding source and has since obtained a grant extension and tentative funding from the Utah

Division of Water Resources, so the ordinance replaces the December 31, 2025 date with December 25,

2027 and allows the Planning Director to extend that date for good cause. Condition #1 requires a

Development Agreement. The wording of that condition does not match the County’s own Land Use Code,

so the ordinance rewrites it to use the Code’s language — an agreement between the property owner and

the County setting out specific measures to reduce the effects the facility may have on surrounding property.

The Development Agreement is still required; only the wording changes. Nothing else changes — not the

overlay, not its boundary, not the zoning, not the approved use, and not Conditions #2 or #4. Jackson

explained that after Planning Commission discussion that it would be prudent to extend the timeline for

completion until 2030.

2. Public Hearing to amend the 2026 budget and 2026 Consolidated Fee Schedule

Presentation

Proposed Budget Amendments were discussed in detail during July Budget Workshops, and are

summarized in agenda packet documents.

At 4:13 p.m. Chair McCandless opened the Public Hearing, to be left open until 5:00 pm on

Wednesday, August 12th

Mary O’Brien spoke against cutting Q4 funding for local non-profits and partner entities (such as the

Southeastern Utah Health Department, Four Corners Mental Health, and local service organizations),

arguing that these services form the essential social safety net of Grand County. O’Brien added that she

supported using dedicated tourism mitigation and transit tax revenues (such as Fund 47) for their intended

8/4/2026 Page 3 of 12

statutory purposes, maintaining that visitors should help offset the infrastructure and environmental impacts

they create in the Moab area.

Pete Gross characterized the Arches Shuttle System as a poor use of taxpayer dollars.

Tory Hill spoke in opposition to the Arches Shuttle System, stating that the Timed Entry system was a more

sensible solution to address congestion at Arches and that she feels it is an irresponsible use of taxpayer

funds.

Allyson Mathis spoke in opposition to the use of taxpayer funds for the Arches Shuttle Pilot as currently

presented, which she feels will not benefit local Grand County residents, and added concerns regarding

liability to the County, for which she claimed that insurance will be paid for by Grand County, along with

additional staffing burdens to the County.

Lynn Jackson expressed that the currently proposed shuttle system is not well conceived and is much more

deserving of better planning, and this lack of planning associated with a large expenditure of taxpayer funds

constitutes a lack of fiscal responsibility. Jackson added that actions such as these will only lead to further

increases to the tax burden on locals.

Samantha Derbyshire, owner of Whole Enchilada shuttle company, spoke in support of the use of optional

sales tax funds on paved trail maintenance, on Grand County Active Trails and Transportation staff, and on

the Spanish Valley Multiuse Path. Derbyshire added that the 10-day RFP process for contracting the shuttle

system was an insult to local businesses.

Jeanine Saia urged the Commission to pause the Shuttle pilot and run the appropriate studies and surveys

for successful implementation of such a complex system.

AJ Throgmorton expressed support for the shuttle pilot as a means of gathering information for further

improvements to public transportation. Throgmorton added that the shuttle pilot represents a wider effort to

mitigate impacts of tourism and manage access responsibly, which he fully supports and encourages.

Throgmorton added that he feels that Commission action has stimulated the economy.

Jen Evers spoke in opposition of the use of optional sales tax funds for the Arches Shuttle Pilot system,

which she feels would be more appropriately allocated to already existing needs that benefit local residents.

Aaron Lindbergh spoke in opposition of the use of optional sales tax funds for the Arches Shuttle Pilot

system, requesting better clarity from the Commission in its deliberations regarding the use of these funds.

Lindbergh added that the trails system was an important economic driver that deserved continued good

stewardship by Grand County.

Pam Hackley spoke in opposition of the use of optional sales tax funds for the Arches Shuttle Pilot system,

stating that employee COLAs should be the highest priority for the use of any excess revenues.

Antoinette Firestack spoke in support of the Arches Shuttle pilot, which she feels will alleviate congestion at

parking lots, reduce emissions, and improve the visitor experience.

Rory Paxman stated that the Commission did not exhibit sufficient transparency in the way that it was

funding the shuttle pilot, added that more studies were warranted for such a project and that local businesses

should have been given more consideration in the bidding process for the system.

Neal Herbert estimated that the general sentiment in the community stands in opposition to the Arches

shuttle pilot as it is currently conceived, and that it is taking funding away from more important county

8/4/2026 Page 4 of 12

projects, subsidizing the federal government. Herbert added that the voters did not have a tourist shuttle

system in mind when they voted to approve the associated tax in 2015.

Dan Stott spoke with concern regarding the Arches shuttle system as proposed, and wondered about the

potential future investment that might be needed, which he hopes will be made by the federal government.

Dwight Johnston stated that he felt the Arches Timed Entry system did not work, and the proposed shuttle

pilot was a great alternative solution to congestion issues.

Citizens to be Heard

Mary O’Brien expressed disagreement to the County being involved in transportation management and

associated funding decisions, stating that there has been a lack of public input on important decision making.

Allyson Mathis pointed out what she viewed as several problems with the Cooperative Management

Agreement being considered in item 13, including its benefit to the welfare of County residents given the

associated costs.

Rory Paxman spoke regarding the proposed lease extension with the Airport Fixed Base Operator, which he

stated is usually done for a term of 30 years rather than the 50 being proposed.

Emily Campbell stated that item D in the consent agenda represented a very poor value for the County given

the work being proposed and associated rates, which she is familiar with given her own profession.

Campbell added that she is unclear regarding the potential funding sources of the Arches Shuttle Pilot

system, given what is in the amendment and the action proposed in item 15.

General Business - Action Items, Discussion and Consideration of:

3. Commission member disclosures and future considerations

Commissioner McCurdy disclosed that his wife is an employee at the Grand County Sheriff’s Office, and

added as a future consideration potential implementation of a property tax calculator and other tools that

could be useful to educating residents.

Commissioner Winfield requested as a future consideration authorization of the Roads Department to

complete improvements maintenance on the paved path, and that he intends to bring back the Burr Oaks

rezone application for consideration at an upcoming meeting.

4. Approval of Consent Agenda Items

A. Approval Of Meeting Minutes

B. Ratification of Payment of Bills

C. Ratification Of Revised Match Letter for The FEMA FMA (Flood Mitigation Assistance) 10%

County Match Letter for Grant Application

D. Ratification Of Branding Refresh for Discovermoab.com

E. Ratification Of Solid Waste SSD Sublease Permission Letter

F. Ratification Of Local Consent for Temporary Alcohol Permit – Outerbike

G. Ratification Of TAP Grant Funding Commitment Letter for Shoulder Widening

H. OSTA Maintenance Technician Backfill Request

8/4/2026 Page 5 of 12

I. Extension Of Airport Lease Agreements for Redtail Air

Motion by Commissioner McCurdy to approve the Consent Agenda, excepting item A, C, and I, as read by

the Chair

Motion Seconded by Commissioner Martinez

Discussion (none at this time)

Motion passes 7-0

5. Moab Office Of Tourism Brand Launch Events: Community Open House at The MIC On

Sept 8; and Mud Springs Ribbon Cutting and National Interscholastic Cycling

Association (NICA) Race on Sept 11 (MOT Director Mick Soleta)

Presentation

Soleta presented details regarding this item which approves costs for two branded events for the Moab

Office of Tourism, to be paid with TRT promotion funds.

Motion by Commissioner Martinez to approve costs associated with producing two branded events,

including: $13,260 for a dedicated event planner, up to $18,960 in event costs for a community open house

and brand launch at the MIC, and up to $20,790 for a grand opening, ribbon cutting, and NICA race event at

the new Mud Springs trail system

Motion seconded by Commissioner Hadler

Discussion

Commissioner Martinez expressed gratitude for staff in their hard work in implementing the brand launch

project. Commissioner Hadler expressed excitement regarding the Mud Springs trail which is a great asset

to the community. Commissioner Winfield added that highway work for accessing the Mud Springs trail was

close to completion.

Motion passes 7-0

Vice-Chair Winfield moved Item 9 up, without objection

9. Ordinance amending Ordinance 725 — Major Utility Overlay for City of Moab Water

Tank & authorization to sign DA (Planning and Zoning Director Andrew Jackson)

Presentation

Jackson explained that the original ordinance #725 passed on November 5, 2025. It included a completion

date of 12/31/25 in item #3. The City's financing sources have changed since the ordinance passed. This

action amends the ordinance to modify the date and to formalize a development agreement consistent with

Section 4.10.1 of the Grand County Code. The Commission will consider suspending the rules and voting on

the Ordinance at this meeting. Jackson formally request that an extension of the timeline for project

completion be extended to December 31, 2030.

Motion by Commissioner McGann to suspend rules

8/4/2026 Page 6 of 12

Motion seconded by Commissioner McCurdy

Motion passes 7-0

Motion by Commissioner McCandless to suspend the rules and adopt the Ordinance amending Conditions

#1 and #3 of Ordinance No. 725 which applied the Major Utility Overlay to a portion of Parcel No. 02-0021-

0113 (City of Moab Water Tank Site), the ordinance's statutory citations, including the Section 4 effective-

date citation to Utah Code § 17-64-502, have been verified against the recodified Title 17 and authorize the

Chair to execute the required development agreement, including an extension of the timeline for project

completion be extended to December 31, 2030, and the possibility for additional extensions to be authorized

administratively.

Motion Seconded by Commissioner McCurdy

Discussion (none at this time)

Motion passes 7-0

1. Selection of Utah Conservation Corps Quote for Grant-Funded Project (Active Trails and

Transportation Operations Coordinator Evan Smiles)

Presentation

In 2024, Grand County, in collaboration with San Juan County and the BLM Moab Field Office, was awarded

$214,364 to construct Phase 1 of the Mud Springs Trail System. Phase 1 includes approximately 11 miles of

beginner, intermediate, and advanced-level trails, built using machine and hand-building techniques, that are

constructed to specifications that accommodate adaptive hand cycling equipment.

In fall 2025, the GCATT Trail Crew, partners, and a professional trail contractor began the first season of

construction of Phase 1. They completed 6.1 miles of machine-built trail and 1.1 miles of hand-built trail,

including a new NICA race course.

August 1 through November 15 will be the final construction window to complete Phase 1, in order to comply

with the project’s NEPA approval to remain on schedule with the grant contract. Only 420’ of machine-built

trail construction remains, and this is contracted to be completed in August.

3.7 miles of hand-built trail construction remains: the majority of the mileage is technical, black-diamond-level

trail that traverses more rocky and featured terrain than the beginner and intermediate trails completed in

2025. Like the rest of the trail system, these trails will be constructed to wider specifications than many of the

area’s trails in order to accommodate adaptive hand cycling equipment.

Grand County was awarded a Utah Outdoor Recreation Grant and Recreational Trails Program Grant for

Mud Springs Phase 1, and has available grant funding to bring on additional help to assist with the non-

technical trail building this fall. This will allow the GCATT Trail Crew to focus on technical areas, ensure that

all areas of the trail are handcycle- accessible, and ensure that Phase 1 is completed during the required

window.

Utah Conservation Corps (UCC) is based locally and was the lowest bid by a significant amount. Existing

grant funding would allow a 5-person UCC crew to devote 6 weeks to the project during the permitted build

window. This grant funding, awarded for Phase 1 trail construction, is scheduled to expire at the end of the

8/4/2026 Page 7 of 12

year. UCC contracts are completed through Utah State University, and Grand County is currently awaiting

their contract for legal review.

Motion by Commissioner McCurdy to approve the selection of the Utah Conservation Corps to assist with

non-technical trail building for Mud Springs Phase 1, and to approve the contract for this work once legal

review has been completed

Motion seconded by Commissioner Hadler

Discussion (none at this time)

Motion passes 7-0

2. Approval of Personnel Services Fees for Special Service Districts accessing

Services (Finance Director Chantel Lindsay)

Presentation

Non-general fund departments are currently charged administrative fees for use of Grand County services.

Currently, special service districts (SSDs) accessing various services through the Grand County Personnel

Services Department are not charged. SSDs currently utilizing Grand County's Personnel Services

Department include the Moab Mosquito Abatement District, Cemetery District, and Grand Water Sewer

Services Agency. For the purpose of assessing personnel service fees, provided services are separated into

the following categories: payroll, insurance, and general HR support.

The personnel services fees were calculated using the following factors: percentage of Personnel Services

staff time devoted to each of three respective categories, which service(s) the SSDs are using, salary and

benefit costs of the Personnel Services Department, and the number of full-time employees at each SSD.

Motion by Commissioner Hadler to approve the personnel services fees for the special service districts

accessing services as presented and direct staff to prepare agreements with the entities for 2027

Motion seconded by Commissioner McCurdy

Discussion (none at this time)

Motion passes 7-0

8. 2026 Moab UMTRA project annual statement of continued compliance (Commissioner

McGann)

Presentation

Project annual report. Commissioner McGann expressed gratitude for the ongoing strong partnership with

the Department of Energy. McGann highlighted a variety of data presented in the report.

Motion by Commissioner McCurdy to approve the 2025-2026 Moab UMTRA project annual statement of

continued compliance.

Motion seconded by Commissioner Martinez

8/4/2026 Page 8 of 12

Discussion (none at this time)

Motion passes 7-0

10. Authorization of a task order with Horrocks engineers, Inc., for the Spanish Valley Drive

corridor road network and traffic analysis study — not to exceed $20,000 (Planning &

Zoning Director Andrew Jackson)

Presentation

Recent rezone and subdivision activity in Spanish Valley is being reviewed against a street network that

has not recently been studied as a whole. Staff proposes a road network and traffic analysis of the area

bounded generally by Easy Street, US-191, Sunnydale Lane, and Rancho Verde Drive, to be performed by

Horrocks Engineers under the County’s existing on-call engineering contract. The study will produce traffic

counts, level-of-service analysis, and an adopted future street and connectivity plan for use in reviewing

subdivision and rezone applications.

Commissioner Winfield stated that he requested this study in response to the Burr Oaks and Novak

Subdivision rezone proposals. Jackson stated that the Code Update project coming in under budget allowed

for this novel expenditure. Commissioner Hedin expressed interest in a wider scope, especially including

Zimmerman Lane and Beeman Drive, to investigate traffic calming measures. Roads Supervisor Cody

McKinney support such an expansion of scope, with the possibility of utilizing Roads Department funds.

Jackson clarified that impact fees could not be used to fund this study. Commissioner Hedin questioned

whether it would be a developer that would typically hire a traffic study as part of its own proposal and due

diligence.

Motion by Commissioner McCurdy to authorize the County Administrator to execute a task order with

Horrocks Engineers, Inc., under the County’s existing on-call engineering services contract, for the Spanish

Valley Drive Corridor Road Network and Traffic Analysis Study, in an amount not to exceed $20,000, subject

to approval as to form by the County Attorney

Motion seconded by Commissioner Martinez

Discussion

Commissioner Hedin stressed the need to manage growth in the south end of Grand County and also

addressing increased safety concerns.

Motion passes 5-2, McGann and Hedin opposed

11. Resolution Adopting Jahries Plat Amendment, application #2613 (Planning & Zoning

Director Andrew Jackson)

Presentation

The Robert and Margaret Jahries Living Trust owns Lot 2-A of the Navajo Ridge Lot 2-A Subdivision, a 6.85-

acre lot in Spanish Valley southeast of Moab that holds an existing house. The Trust wants to split it into two:

a 4.09-acre lot that keeps the house (Lot 2-A) and a new, vacant 2.76-acre lot (Lot 14-A). Because Lot 2-A is

within a recorded subdivision, this filing amends that recorded plat—it creates one new buildable lot. Both

lots are single-family, are served off the existing Red Rock Drive and Far Country Drive private easements

8/4/2026 Page 9 of 12

through a 40-foot private access tract, and are several times the minimum lot size. Staff recommends

approval with conditions that must all be met before the plat is recorded.

Motion by Commissioner Martinez: Having considered the staff report, the proposed final plat,

public comments, and Utah Code § 17-79-711 and the Grand County Land Use Code as amended by

Ordinance No. 708, and finding that the plat amendment, as conditioned, conforms to the applicable

objective standards of the Land Use Code, that each lot has frontage on and legal access to an existing

street, I move to approve the Navajo Ridge Lot 2-A Subdivision Amended as an administrative item and

to adopt the resolution, subject to the conditions in the resolution, and to authorize the Chair to

sign the plat once the Planning and Zoning Director confirms the conditions have been met, pending

completion of legal review

Motion Seconded by Commissioner McCandless

Discussion (none at this time)

Motion passes 6-1, Hedin opposed

12. Resolution approving DT Subdivision Minor Subdivision, application #2612 (Planning &

Zoning Director Andrew Jackson)

Presentation

Venture Capital Holdings, LLC — Robert Lucero, managing member — owns a 3.22-acre parcel at 4060

Spanish Valley Drive in the Rural Residential (1 acre) Zone, with a house and detached garage on it. The

company wants to split it into two lots: a 2.15-acre lot that keeps the existing house, and a 1.00-acre vacant

lot fronting Valle Del Sol Drive. The plat also gives the County a strip of land along Spanish Valley Drive for

road right-of-way. Both lots front a public street and meet the minimum lot size. Part of the property lies in the

mapped FEMA floodway, where building is prohibited.

Motion by Commissioner McCurdy: Having considered the staff report, the proposed final plat,

the FEMA flood mapping, public comments, and Utah Code §§ 17-79-701 through 17-79-704, and finding

that the plat, as conditioned, conforms to the applicable objective standards of the Grand County Land

Use Code and that each lot has frontage on and legal access to a public street, I move to adopt

The resolution approving the Final Plat of the DT Subdivision and accepting the dedication of

public right-of-way shown thereon, subject to the conditions in the resolution, and to authorize the Chair

to sign the plat once the Planning and Zoning Director confirms the conditions have been met, pending legal

review

Motion seconded by Commissioner McCandless

Discussion (none at this time)

Motion passes 5-1, Hedin opposed, McGann abstaining

13. Grand County + NPS Cooperative Management Agreement for Moab-to-Arches Shuttle

(Commissioner Martinez)

Presentation

8/4/2026 Page 10 of 12

This agreement sets the terms under which Grand County and the National Park Service will jointly manage

the Moab–to-Arches shuttle service, covering each party’s responsibilities, operating hours, routes, and how

the County and NPS will work together in the coming year. Signing it puts the framework in place for the pilot

to launch this fall.

Motion by Commissioner Martinez for Grand County to sign the Moab-to-Arches Shuttle Cooperative

Management Agreement with the NPS

Motion seconded by Commissioner McCurdy

Discussion

Commissioner Hadler requested a summary of revisions made after legal review, including whether remarks

by the County Attorney were reasonably incorporated and considered. Attorney Stocks explained his

process for offering comment, with no expectation that all comments be incorporated. Commissioners Hedin

and McCurdy asked for an assessment as to the level of risk that the County is taking on in this agreement.

Attorney Stocks gave a general response. Commissioner McGann expressed concerns that there would be

many ongoing and unpredictable costs associated with this agreement, and that the entire process for

implementation of the shuttle program was being done hastily, in a way that introduces risk. Commissioner

Hedin expressed concerns regarding the cost and length of the contract, use of employee resources,

potential change orders, general logistics, rider safety and associated liability.

Motion passes 4-3, Hedin, McGann, and Hadler opposed

Vice-Chair Winfield called a 10-minute recess at 6:45 p.m.

Vice-Chair Winfield reconvened the meeting at 6:54 p.m.

14. Grand County + Via Moab to Arches Shuttle Service Agreement (Commissioner Martinez)

Presentation

This agreement covers the operator selected through the County’s competitive procurement to run day-to-

day shuttle service, including drivers, vehicles, and maintenance. It carries the same service and liability

terms as the Cooperative Management Agreement, so the two documents work together once both are

executed.

Motion by Commissioner Hedin to postpone action on the item

Motion seconded by Commissioner Hadler

Discussion

Commissioner Martinez pointed to indemnification and cost structure items in the contract, which had been

revised by the Attorney Stocks by the 3:30 p.m. before the meeting. Attorney Stocks explained those

proposed revisions at greater length, including but not limited to what he considers vague language

regarding ‘project management and other operations.’ Commissioner Hedin stressed that public concern on

this matter was not being appropriately recognized, and the public deserved a chance to weigh in on such a

large contract.

Substitute motion by Commissioner Martinez approve the Master Services Agreement between Grand

County and Via Transportation Inc. for the Moab to Arches Transit Pilot Service in an amount not to exceed

8/4/2026 Page 11 of 12

$442,668, to be funded through Fund 47 (Optional Sales Tax / Mass Transit Fund), and authorize the

Commission Chair to sign all necessary executable documents and to appoint Chair to review and approve

and additional changes resulting from ongoing legal review

Substitute motion seconded by Commissioner McCurdy

Discussion

Commissioner Hadler expressed discomfort with moving forward at the currently proposed rate.

Commissioner Hedin suggested forming an impromptu subcommittee or holding an emergency meeting so

that more time could be taken for review. Commissioner McCandless clarified that she will represent the

Commission on next steps for any potential revisions that would be subject to legal review.

Substitute motion passes 4-3, Hedin, McGann, and Hadler opposed

15. Consideration of 500k from the Transit Tax in Fund 47 reserves for use on the Moab-to-

Arches Shuttle (Commission Administration)

Presentation

Motion by Commissioner McCurdy to approve the use of $350,000 from the Transit Tax Fund 47 for the

county portion of the Moab-to-Arches shuttle pilot program

Motion seconded by Commissioner Hadler

Discussion

Commissioner Hadler stated that he felt that $350,000 was being pulled from a new Fund rather than the

approximate $350,000 that was budgeted to be pulled from the General Fund reserves, and that it was

pulling from savings that were essentially spoken for due to expected future maintenance burdens.

Commissioner Hedin referred to the original ballot measure which authorized collection of the taxes

proposed to be spent. Hedin added that bypassing endless county needs for novel expenditures outside of

budget was not a sustainable approach. Chair McCandless stated that spending these funds would not

hinder completion or compromise the funding for the Spanish Valley Multiuse Path, stated that visitors paid

an estimated 70% of these tax revenues, and that this system would be a driver for needed economic

growth. Commissioner Winfield stated that other Commissioners were hypocritical in their criticism of this

effort, and referred to his own extensive efforts to capture large amounts of State funding for badly needed

projects across the County.

Motion passes 4-0, Hedin, McGann, and Hadler absent

16. County contributions to non-county entities and special districts (Commissioner Martinez)

Presentation

Currently, there are no standard procedures for the County to address requests for donations or funding from

non-county entities and special districts. The Commission will consider the types of documentation, letters,

and agreements that staff should develop to process these requests.

Motion by Commissioner McCurdy to direct staff to create policies and procedures for non-county entities

and special districts to request donations or funding support from the County for future consideration by the

commission.

8/4/2026 Page 12 of 12

Motion seconded by Commissioner Martinez

Discussion (none at this time)

Motion passes 4-0, Hedin, McGann, and Hadler absent

J. Item I (Consent Agenda): Extension of Airport Lease Agreements for Redtail Air

Presentation

Airport Director Steven Gleason explained 30 years with 4 five-year extensions, to be standardized with the

50-year lease that all other tenants are receiving. Gleason explained that the County benefits from longer

leases with the FBO, which gives that important partner the ability to invest, strengthen and offer higher

value services. Longer lease length also gives value to hangar owners. Gleason to explore the

implementation of privilege tax for commercial ownership of hangars.

Motion by Commissioner McCurdy to extend the airport lease agreement with Redtail Air

Motion seconded by Commissioner Martinez

Discussion (none at this time)

Motion passes 4-0, Hedin, McGann, and Hadler absent

General Reports

General Commission Reports and Future Considerations

Commissioners offered their reports, as summarized in the agenda packet.

Vice-Chair Winfield adjourned the meeting at 7:36 p.m.

__________________________________

Melodie McCandless

Chair, Grand County Commission

ATTEST:

_______________________________

Gabriel Woytek

Grand County Clerk/Auditor

Audit trail

Details

FILE NAME 8.4.2026 REG GCC MINUTES approved - 9/2/26, 7:15 AM.pdf

STATUS Signed

STATUS TIMESTAMP 2026/09/02

23:57:55 UTC

Activity

SENT

dvanhorn@grandcountyutah.gov sent a signature request to:

Melodie J. McCandless (mmccandless@grandcountyutah.gov)

Gabriel Woytek (gwoytek@grandcountyutah.gov)

2026/09/02

13:16:20 UTC

SIGNED

Signed by Gabriel Woytek (gwoytek@grandcountyutah.gov) 2026/09/02

15:08:26 UTC

SIGNED

Signed by Melodie J. McCandless (mmccandless@grandcountyutah.gov) 2026/09/02

23:57:55 UTC

COMPLETED

This document has been signed by all signers and is complete 2026/09/02

23:57:55 UTC

The email address indicated above for each signer may be associated with a Google account, and may either be the primary email

address or secondary email address associated with that account.

Article details

CategoryOfficial Source
CityMoab
ToneNeutral